New templates
This page lists templates as they are added to the site — the newest first, so you can see what has appeared since your last visit.

PhinisheD Thesis Front Matter Starter
A neutral multilingual thesis front-matter starter with a clean title banner, abstract, contents, and chapter scaffold.

a0poster Landscape Poster
A0 landscape poster on the bare a0poster class, laid out by hand in a four-column minipage grid.

a0poster Portrait Poster
A0 portrait poster on the bare a0poster class, laid out by hand in plain minipage columns.

Aalok Devanagari Journal
A Marathi journal article starter with bilingual abstract space, Devanagari section headings, editorial metadata, an audit table, and a neutral XeLaTeX layout.

AASTeX
AAS Journals (ApJ, AJ, PSJ and others) articles, using the official AASTeX v7 class. Verified to compile to a PDF with a resolved bibliography.

AAU PhD Collection Thesis
An Aalborg University 'collection of papers' PhD thesis: an introduction part plus separately-typeset papers as later parts, each with its own bibliography.

Abakós
Portuguese and English Abakós-style article starter with bilingual abstracts, keywords, equations, tables, and a long-form research structure.

ABNT Academic Journal Article
ABNT-oriented academic-journal article starter with multilingual metadata, affiliations, quotations, equations, tables, and references.

abnTeX2
Implements the Brazilian ABNT national standard for theses, articles and reports, with author-year citations and ABNT-formatted references.

Academic Book Template
A memoir-based book skeleton with a title page, front-matter abstract and chapter epigraphs.

Academic Business Card
A QR-enabled academic contact card with department, email, ORCID, and a ten-card A4 print sheet.

Academic CV Template
A single-column academic CV with a two-column header, circled FontAwesome section icons, and helper macros for publications, degrees and jobs with comma-separated tag lists.

Academic Response Letter
A point-by-point academic response-letter starter with reviewer callout boxes, author responses, and a change summary.

Academic Templates Essay
An academic essay starter representing the LaTeX-Templates collection, with abstract, structured sections, list, table, and conclusion.

Academic Title Page
A separate title page with a centred title/author/date block, built with titling's pre/post maketitle hooks over plain article.

achemso
ACS journal submissions, using the official achemso class. Verified to compile to a PDF with a resolved bibliography.

ACM Publications
ACM journal and conference papers, using the official acmart class. Verified to compile to a PDF with a resolved bibliography.

ACM Conference Proceedings
Legacy ACM conference proceedings starter with explicit conference metadata, author affiliations, abstract, keywords, tables, and bibliography.

ACS Publications
American Chemical Society journal submissions, using the official achemso class. Verified to compile to a PDF with a resolved bibliography.

ACTS White Paper
A neutral technical white-paper starter with an executive summary, design principles, work packages, measures, risks, and a decision request.

AguaClara Research Report
A water-treatment research report starter with an executive summary, experimental design, methods, water-quality results, and engineering recommendation.

AIAA Conference Papers
The official class for AIAA technical conference papers. Verified to compile to a PDF with a resolved, numbered bibliography.

AJbook Chinese/CJK Book
A bilingual Chinese and English book starter with front matter, chapters, mathematics, tables, and an editable CJK workflow.

Albi Beamer Starter
An original triangular-accent Beamer starter for research talks, with a takeaway-first opening, comparison slide, and action-oriented close.

AltaCV
A two-column CV/résumé class with a colour sidebar, skill ratings and achievement icons; compiles under plain pdflatex.

AmberJ LaTeX Book Template
A ready-to-edit book template with dedication, chapter quotations, front matter, contents, figures, tables, acknowledgements, and sample chapter structure.

AMCOS Conference Booklet
A conference book-of-abstracts starter with a coloured timetable, tagged talk abstracts, a poster list, and useful-information pages.

Amnestyreport Human Rights Report
A human-rights and community-safety report starter using the Amnestyreport class, with an executive summary, evidence register, findings, recommendations, and implementation review.

AMS Article (amsart)
AMS-style mathematics journal articles, using the official amsart class. Verified to compile to a PDF with a resolved bibliography.

AMS Book
AMS-style mathematics books, using the official amsbook class with front/main/back matter and a full theorem environment set.

AMS Proceedings Article
American Mathematical Society conference proceedings articles, using the official amsproc class from the amscls bundle. Verified to compile to a PDF with a resolved bibliography.

Amurmaple
A new, modern Beamer theme with a clean layout and an optional Delaunay-triangulation background (requires LuaLaTeX, not enabled here).

andre-CV Cover Letter Class
A bilingual German-English cover-letter and profile starter based on the reusable andre-CV application workflow.

AnMnv eBook
A compact book starter with front matter, chapters, principles, worked examples, appendix, table of contents, and a resolved BibTeX bibliography.

Anonymous ACM Submission
Double-blind ACM submissions, layering the anonymous-acm package on acmart to toggle anonymised/de-anonymised text with one option. Verified to compile to a PDF with a resolved bibliography.

Australian and New Zealand Journal of Statistics Article
A neutral statistics article starter with model notation, estimates, uncertainty, tables, and references.

Annals of Mathematics (aomart)
Annals of Mathematics journal submissions, using the official aomart document class. Verified to compile to a PDF with a resolved bibliography.

APA 6th Edition
APA 6th edition journal articles, using the apa6 document class. Still required by departments and journals that have not moved to APA 7. Verified to compile to a PDF with a resolved bibliography.

APA 7th Edition
APA 7th edition journal articles, using the official apa7 class. Verified to compile to a PDF with a resolved bibliography.

apacite
APA-style author-year citations and references on a plain article, using the apacite package. Verified to compile to a PDF with a resolved bibliography.

Arabic arXiv Article
An ArabicArxiv XeLaTeX article starter with Arabic title matter, abstract, keywords, methodology, results table, bilingual note, and references.

Arabic Book
An Arabic/English book starter with automatic front matter, chapters, appendices, tables and equations, using the arabic-book class.

arasgungore CV
Popular engineering-student CV, very widely forked as a starting point. Icons ported to fontawesome5 (upstream's fontawesome v4 does not render on this system).

Arbeitsblattgenerator Worksheet
A classroom worksheet starter with task and solution boxes, an extension prompt, and an editable TikZ graph.

Arguelles
A structurally distinct, typography-focused Beamer theme built around the Arguelles typeface.

ArsClassica Article
A short article styled with classicthesis's arsclassica appearance: small-caps headings, Palatino-metric text, and Bringhurst-inspired restraint.

Arthur CV & Cover Letter
A two-column CV with an optional photo, colour-banded skills rail and timeline body, paired with a matching cover letter in the same class family.

articleingud (Revista INGENIERÍA)
Revista INGENIERÍA (Universidad Distrital, Bogotá) articles, using the official articleingud class with its structured Context/Method/Results/Conclusions abstract. Verified to compile to a PDF with a resolved bibliography.

Arubertoson Resume and Cover Letter
Matched one-page resume and cover letter with shared burgundy accent, synthetic software-engineering profile, quantified experience, projects, and a tailored application narrative.

arXiv Preprint Style
A widely used NeurIPS-derived preprint style for arXiv submissions, using the arxiv-style package on top of the standard article class. Verified to compile to a PDF with a resolved bibliography.

arXiv Technical Report
A simple two-column technical-report / conference-paper layout, using the bundled simpleConference.sty (based on the classic latex8.sty).

ASAE Transactions
Legacy ASAE Transactions manuscript starter using the asaetr class.

ASCE-Style Engineering Manuscript
Civil and structural engineering manuscripts in the ASCE format, using the unofficial ascelike class, with review and camera-ready modes. Verified to compile to a PDF with a resolved bibliography.

Ascendho Chinese CV
A one-page UTF-8 Chinese CV with profile, education, experience, projects, skills, bilingual contact details, and editable section rules.

ASEAN Journal on Science and Technology Article
Two-column ASEAN Journal on Science and Technology for Development article starter with metadata, methods, tables, equations, and references.

ASG ATS Resume
A one-page, text-first ATS resume with clear headings, aligned dates, measurable experience, projects, skills, and education.

ASME Conference Paper
ASME conference papers (IMECE and other ASME conferences), using the official asmeconf class with its inline author/affiliation layout and nomenclature list. Verified to compile to a PDF with a resolved bibliography.

ASME Journal Paper
ASME journal papers (Journal of Heat Transfer and sibling ASME journals), using the official asmejour class with its preprint title bar and nomenclature list. Verified to compile to a PDF with a resolved bibliography.

ASOiMAT Journal Article
A Spanish-language academic article for the ASOiMAT journal — bilingual abstract with keywords, numbered sections, equations and tables, and numbered references.

Assignment Essay
A compact quantitative essay and assignment sheet built around a queueing-system exercise, with instructions, worked answer, model critique and reflection prompts.

AstroPAH Newsletter
A branded scientific-community newsletter with an editorial, an in-focus feature, paper abstracts, a meetings list and announcements, each with its own header banner.

ATS LaTeX Resume
Text-first one-page ATS-friendly resume with selectable text, conventional headings, quantified experience bullets, projects, skills, and education.

ATS Resume Agent Cover Letter
A text-first ATS-oriented cover letter with Unicode mapping and evidence-focused application sections.

Auckland Thesis
A memoir-based thesis starter with an Auckland-style title page, declaration, abstract, contents, chapters, equation, table, appendix, and acknowledgements.

Auriga
A minimalist Beamer presentation theme with a clean, mostly-monochrome look designed to keep the emphasis on content.

Austrian Journal of Statistics
An Austrian Journal of Statistics article starter with summary, keywords, reproducible estimator, bootstrap table, address block, and bibliography.

Avinal Resume
A compact one-page resume where every entry (job, project, education) uses the same title/subtitle/dates/body layout, with an extended mode that toggles extra detail on and off from one source file.

Awesome Beamer
An opinionated typography-first Beamer starter with a diagonal title page, section transitions, a three-signal diagram, and a progress-aware footer.

Awesome Cookbook
A visual cookbook starter with recipe metadata, ingredient lists, preparation steps, categories, and appendix sections.

Awesome CV Timeline
A two-column CV with a genuine graphical timeline drawn down the middle of the page, connecting experience and education entries.

Awesome Resume/CV
The most-starred LaTeX CV class on GitHub: a two-colour, icon-driven resume/CV layout with a matching cover letter class.

Azhar Two-Column Resume
A compact two-column engineering resume with a profile rail for tools and education and a main column for experience, projects, and impact.

Basic Academic Journal Article
A plain single-column academic journal article, with a boxed abstract, keywords, and natbib citations.

Basic LaTeX2e Book Template
A plain book-class starter with real scaffolding — numbered examples, algorithm blocks, natbib citations and microtype — rather than a bare skeleton.

Basic Template
The plainest possible article starter — a title page and section structure, no custom class or packages beyond encoding, language, and hyperlinks.

Basque Book
A Basque-language book and thesis starter with front/back matter, chapters, tables and a bibliography, using the basque-book class.

Beamer Presentation
Substitute for the original CC-BY-NC-SA Beamer deck (Vel, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a Beamer presentation template of the same kind: klb2/beamer-presentation-template, Apache-2.0, built on the metropolis theme.

Beamer Reveal
A reveal-ready Beamer presentation starter with incremental points, a process diagram, scorecard, and next-action close.

RTL Beamer Class Patches
A LuaLaTeX right-to-left Beamer starter using the beamer-rl class patches with a compact agenda, hypothesis, and evidence slides.

Beamer Dark Themes
A dark-room presentation starter using the beamerdarkthemes cormorant palette, with original slide content, a data table, and a TikZ signal diagram.

Leeds DetlevCM Beamer Theme
A DetlevCM Beamer presentation starter with an agenda, question, evidence table, and neutral closing slide.

JLTree Beamer Theme
A tree-structured Beamer presentation starter with an agenda, decision framing, evidence slide, and action-focused close.

Nirma Academic Beamer Theme
A Nirma academic Beamer starter with a branded colour system, title layout, agenda, and evidence slide.

beautybook
A decorative book class with coloured theorem boxes and a two-tone chapter-heading treatment, using an original abstract cover mark instead of upstream's stock photography.

Beilstein Journals
The official class for the Beilstein Journal of Organic Chemistry and the Beilstein Journal of Nanotechnology. Verified to compile to a PDF with resolved cross-references and citations.

Belgian Formal Letter
A Belgian formal-letter starter using beletter, with sender and recipient blocks, date, copy line, and signature.

Bergen Linguistics Paper
A linguistics paper starter with examples, glossed data, title-page metadata, and discussion sections.

Better Poster (Portrait)
An A0 portrait #betterposter starter: a giant central-claim banner, a two-column body with a results figure, and a conclusions/limitations/references side column. A different orientation and licence from this site's other Better Poster starter.

Better Poster
A0 landscape poster in Mike Morrison's #betterposter big-finding layout: one central claim in giant text, detail relegated to narrow side columns.

Bewerbung Application Set
A full German job-application set — cover letter and CV in one document, sharing one personal-data file and a per-application company-address row.

Bezos Business Card
An imposed sheet of 8 double-sided business cards (front + back, 2x4) with crop marks, using the elzcards package. Compiles to a two-page PDF, front sheet then back sheet.

Bibby Annual Report
An annual-report starter for communicating performance, impact, governance, resources, and priorities.

Bibby Business Report
A decision-focused business report with a recommendation, operating snapshot, risks, actions, and sign-off.

BibLaTeX CV
An academic CV generated entirely from a .bib file — education, publications and invited talks each rendered by biblatex-cv's own custom entry types and bibliography drivers.

Bibliogon Comic Book
A panel-by-panel comic-book starter with speech balloons, captions, issue notes, and a story bible.

Bilingual Homework Template
A genuinely bilingual homework class — English chrome with full Chinese support in the body text, both rendering correctly in the same document. Verified to compile to a PDF with real mixed-language glyphs and a resolved bibliography.

Bilkent Economics Beamer
A Bilkent Economics Beamer theme starter with a title page, co-author/location metadata, result diagram, table, and closing slide.

billryan Resume
A single-column résumé class with dated section headers and FontAwesome icon labels, popular with Chinese and English CJK users alike.

Binder Spine Labels
A sheet of branded ring-binder spine labels (company strip plus label text) for a real 5-binder filing system. Compiles via the flabels class, no fontspec, no pstricks.

BISTUA Journal Article
A neutral Spanish science article starter with abstract, keywords, equations, results table, and references.

bizcard
A US-size business-card starter using CTAN's bizcard package to impose ten framed cards on A4.

Blank Dotted Notebook with Index
A printable dotted field notebook with an index, project key, and repeatable pages for experiments, observations, and planning.

Book of Abstracts
A conference abstract booklet starter with reusable contribution entries, contents, author index, and keyword index.

Bookcover Wraparound Cover
A complete editable paperback wraparound cover with front, spine, back, bleed, trim marks, and typographic components using the bookcover class.

bookest
An extension of the standard book class adding coloured titling, running headers and a configurable cover.

BookML Technical Book
An accessible technical-book starter using BookML hooks for a shared LaTeX, PDF, and web-oriented source workflow.

booktemplate
A quiet 6.25 x 9.25 inch book starter with a drop-cap preface, front matter, chapters, appendix, and colophon.

br-lex Brazilian Legal Text
A Brazilian legal-text starter with an ementa, preliminary provisions, numbered articles, responsibilities, and final provisions.

University of Bristol EEE Poster
A three-column electrical and electronic engineering starter for clear research communication.

BUAA Thesis Starter
The BUAAThesis Beihang University engineering-thesis starter with bilingual front matter, the BUAA class, reference styles, and title-page artwork.

Bucknell Thesis Title-Page Starter
A neutral Bucknell-style honors-thesis title page with abstract and contents scaffold.

buscard Business Cards
A compact repeated business-card sheet with editable contact fields and a dark, high-contrast layout.

Programmer Business Card with Photo
A photo-forward QR-enabled developer business-card sheet with an editable avatar panel, GPG identity, and contact fields.

Business Card Template
A green field-note business-card sheet with repeated editable cards and printer-ready dimensions.

Business Cards LaTeX
A CC-BY-SA-aware ten-up business-card sheet with editable contact fields and an optional QR link.

Programmer Business Cards
A QR-enabled developer business-card sheet with editable role, contact, project, and GPG identity fields.

Business Proposal Template
A concise business proposal with an opportunity statement, scope, deliverables, milestones, commercial assumptions, and approval section.

Business Restructuring Strategy
A decision-ready restructuring proposal with situation analysis, options, success measures, workstreams, risks, milestones, and an executive decision record.

Business Card with QR Code
A printer-ready single visiting card with exact dimensions, crop marks, and a privacy-conscious vCard QR code.

Cal Poly CSC300 Lab Report
Computer-science laboratory report starter organized around design, implementation, reproducible experiments, results, evaluation, and conclusion.

Cal Poly Thesis
A Cal Poly Master's thesis starter with institutional front matter, committee page, chapters, appendices, lists, and bibliography.

Multi-Year Calendar (calxxxx-yyyy)
A two-year (2026-2027) calendar, twelve compact month grids per year side by side, English weeks Sunday-Saturday. Generated from H.-Martin Munch's calxxxx-yyyy.tex; the year range is fixed in the source (see comment) since the pipeline compiles headlessly.

Cambridge PhD Thesis (CUED)
The University of Cambridge (CUED) PhD thesis class, with title page, abstract and bibliography handling for a formal dissertation.

Canada Study Permit Cover Letter
A structured study-permit letter with study plan, funding, supporting-document, and compliance sections.

card Business Cards
A self-contained business-card sheet with editable contact fields, repeated cards, and printer-ready dimensions.

Carleton Essay Template
A college essay layout with course metadata, a claim, evidence sections, optional double spacing, and references.

Cascadilla Proceedings Project
Cascadilla Proceedings Project papers (used by linguistics conferences such as WCCFL and BUCLD), using the official cascadilla class with its title-page signature line and natbib citations. Verified to compile to a PDF with a resolved bibliography.

CAU Exam Paper
A China Agricultural University exam-paper layout with a title block, score table, numbered sections and an optional answer key. Font patched to compile on this site's TeX Live; verified rendering real Chinese glyphs.

CCR Journal Article
CCR research article starter with computer-science metadata, reproducible methods, results, and declarations.

Revista CEDAMAZ Article
A Spanish-language scientific article starter for Revista CEDAMAZ-style submissions.

Celestia
A modern, elegant Beamer theme with carefully chosen colours, typography and layouts.

Celiobjunior Resume
A modern single-column resume with per-entry PDF bookmarks, self-contained with no custom class.

CertificateTemplate
English completion-certificate starter with a double-line frame and editable recipient, programme, date, and signature fields.

Cogenda Technical Report Templates
Cogenda's multi-class technical-report family with English and Chinese reports, manuals, articles, document metadata, revisions, and report front matter.

Chang'an University Submission Letter
A neutral manuscript-submission cover letter with editor, contribution, scope, and declaration sections.

Cheat Sheet Template
A three-column landscape revision-sheet starter with signals, transforms, LTI systems, sampling, formulas, and exam workspace.

Chinese Book Template
A ctexbook-based starter for Chinese-language technical books, with real front matter and a worked graph-algorithms chapter.

Chinese and English Article
A Chinese and English bilingual article starter with parallel title matter, abstracts, sections, shared equations and tables, and references.

Chinese Journal of Computers Article
A Chinese and English-friendly computer-science article starter with methods, experiments, and discussion.

Chinese LaTeX Course Paper
A Chinese course-paper starter with bilingual metadata, structured sections, equations, and a compact results table.

Chongqing University
A bilingual (English/Chinese) Beamer theme for Chongqing University, with campus-photo watermark and official seal.

Chronology Project Calendar
A compact project roadmap calendar with a visual Jan–Aug timeline, milestone register, exit evidence, owners and dependency decisions.

CHS Physics 211 Lab Report
Physics laboratory report starter with purpose, theory, apparatus, uncertainty-aware data tables, analysis, discussion, and conclusion.

CHS Physics Lab Report
A physics laboratory report starter with a pendulum experiment, raw timing table, linearised analysis, uncertainty checklist and conclusion prompts.

CID Article
English didactics article starter for Commentarii informaticae didacticae, with short running metadata, structured affiliations, abstract, keywords, theorem, and BibLaTeX bibliography.

Canadian Journal of Economics (CJE)
Canadian Journal of Economics articles, using the official bilingual cje class with English abstract, French résumé, and JEL classification fields. Verified to compile to a PDF with a resolved bibliography.

Canadian Journal of Statistics
The official bilingual (English/French) class for The Canadian Journal of Statistics. Verified to compile to a PDF with a resolved bibliography in the correct language.

Ckaserer Sidebar CV
Two-column academic and industry CV with a narrow profile rail for contact, focus, tools, and languages alongside a chronological main record.

Classic Homework Template
A classic single-file homework layout with a title block, numbered problem sections and solution headers. The most-starred homework template on GitHub.

Classic Lined Title Page
A classic physics-preprint title page (hep-title) with a ruled series masthead, arXiv identifier, multi-author affiliations and an abstract.

Classy Business Card
A clean blue-accent academic or professional business card, with QR code and ten-up A4 print imposition.

CleanCV
A modern, minimal single-column academic CV with elegant serif typography and a CV/resume mode switch for showing or hiding sections.

CleanEasy
A minimalist Beamer theme with its own footline, section-divider and title-page templates, public domain (Unlicense).

Clean Thesis
A clean, distraction-free thesis style layered on scrreprt, with configurable colour themes and bibliography handling.

CLF Annual Report
An annual-report starter with an at-a-glance dashboard, leadership message, impact, governance, resources, and forward priorities.

Condensed Matter Physics (cmpj)
Condensed Matter Physics journal articles, using the official cmpj3 package with the journal's logo, ORCID icons, and CC-BY footer. Verified to compile to a PDF with a resolved bibliography.

CMU Homework Template
A minimal Carnegie Mellon homework layout with numbered question blocks and lettered sub-parts. Plain article class, no custom .cls. Verified to compile to a PDF.

Chinese Report and Slide Set
A bilingual Chinese/English report starter whose concise sections can be moved directly into Beamer presentation frames.

CNB Working Paper
Czech National Bank working paper starter with JEL codes, keywords, state-space equation, results table, source note, and bibliography.

College Assignment Collection
A compact two-column engineering-report layout with a settings/ file split for packages, page geometry and macros. Verified to compile to a PDF with a resolved bibliography and a self-contained TikZ circuit diagram.

College Chemistry Lab Report
A chemistry laboratory report starter with safety, reaction, titration data, calculations, uncertainty evaluation, and conclusion sections.

Colourful Maths Assignment
A clean maths problem-set class with numbered problems, claim/proof environments and QED tombstones. Verified to compile to a PDF; the class is bundled because an unrelated CTAN package shares its filename.

Comillas Teaching Worksheet
A neutral exercise, quiz, and teaching worksheet starter with task prompts and work areas.

Commercial Credit and Loan Report
A lender-facing credit application starter covering the applicant profile, requested facilities, repayment capacity, collateral, risks, controls, and approval conditions.

Commercial Real Estate Valuation Memo
A property-underwriting memo with an asset profile, income approach, capitalisation cross-check, sensitivity table, and diligence actions.

Compact Academic CV
A one-column academic CV in the Linux Libertine style, with publication years pulled into the margin.

Compact Laboratory Book
A pocket-sized A5 bench notebook (same labbook class, tighter trim size) for dated entries across several concurrent experiments, with an auto-generated experiment index.

Compositionality Article
A one-column Compositionality article starter with a workflow model, editable TikZ figure, and bibliography.

Computational Complexity
Computational Complexity journal articles, using the official cc class with its keywords/subject-classification fields and author-details footer. Verified to compile to a PDF with a resolved bibliography.

Concrete
cLagrange, a flat theme from the Concrete bundle's collection of seven — a diagonal-shaded rounded-corner title canvas over a light background.

Conference Event Timetable
A single-page, full-year calendar with holidays and a multi-day conference period marked, drawn entirely in TikZ. Compiles to a two-page PDF (Jan-Jun, Jul-Dec) with events on their correct weekdays.

Constructions
A submission-style article in the shape of the Constructions journal's own template — sections, a numbered linguistics example, a table, and a resolved bibliography.

Contra Dance Calling Card
A calling-card starter for contra dances with named moves, phrase boundaries, and move counts.

Contract
A legal-document starter with structured numbered clauses, subclauses, and a signature block.

Contractor Invoice Template
Editable contractor invoice with client details, line items, subtotal, tax, total, and payment terms.

Cookbook Recipes
A recipe-book layout with ingredient lists, numbered method steps and prep/cook-time info boxes, for collecting recipes into a small cookbook.

Cooking Recipe Template
A compact two-column recipe-card layout with servings, ingredients, method, and kitchen notes.

Two-Column Recipes
Recipes as a compact two-column list — ingredient on the left, the method step that uses it on the right — with optional side-dish, hint and preparation-time annotations.

Cooking Units Recipe
A two-column recipe starter using cooking-units for consistent quantities, with servings, timing, ingredients, methods, and kitchen notes.

Cooking Symbols Recipe
A recipe-card starter using editable oven, heat, utensil, and serving symbols.

cookybooky
A practical recipe-book starter with structured ingredients, numbered method steps, serving and time metadata, and coloured recipe cards.

Corporate Annual Report Book
A concise annual business review with a board-ready summary, headline metrics, performance narrative, risk register and decisions requested.

Corporate Quarterly Financial Statement
A compact quarterly reporting pack with key indicators, income statement, balance-sheet snapshot, cash bridge, variance commentary, outlook, and controls.

Corporate Treasury & Cash Plan
A practical 13-week treasury plan with liquidity dashboard, rolling forecast, assumptions register, controls and escalation actions.

Course Summary Cheatsheet
A three-column landscape course-summary starter with formulas, filter identities, a problem-solving checklist, exam workspace and common pitfalls.

Coursepaper Essay
A double-spaced course-paper starter using coursepaper, with course metadata, abstract, equations, table, conclusion, and bibliography.

Coursework Term Paper
An argued term-paper essay (sans-serif title block, course/due-date byline) with a resolved bibliography, on the LaTeX3 term-paper class.

Coventry University Thesis
A Coventry University PhD/MPhil thesis template with the official title page, degree wording and APA7-style bibliography.

Cover Letter Simple
A straightforward standard-letter cover letter with a simple name-and-contact header.

Modern Cover Letter Template
A modern semantic-command cover letter with a compact contact header and restrained accent rule.

CRC-template CV Profile
A DFG-style collaborative research profile with editable general information, academic degrees, career, CRC role, publications, and service sections.

Creative Writing LaTeX Framework
A modular memoir-based novel starter with author settings, format presets, front matter, chapters, character notes, and original/edited version switching.

Crossword Worksheet
An editable crossword worksheet with a numbered grid, across and down clue columns, and a replaceable answer key.

CS Homework Template
A computer-science homework layout with header/footer and numbered question blocks. Ships with verbatim code listings rather than minted, since this site's pipeline does not pass -shell-escape. Verified to compile to a PDF.

CS Technical Lab Report
A technical/lab report on the hebdomon class (KOMA-Script based, sans-serif) with chapters, a resolved bibliography and a code listing.

Computer Science Technical Report
A two-column computer-science technical-report starter with experiment metadata, a reproducible code listing, results table, and limitations section.

CSTUG Bulletin
CSTUG Bulletin articles (Czech/Slovak TeX users' group), using the official csbulletin class in English. Verified to compile to a PDF with a resolved bibliography.

Complexity Science Hub Beamer
A Complexity Science Hub Beamer starter with a hypothesis block, evidence table, interpretation, and QR closing slide.

CTeX Chinese Book
A Chinese book starter using the CTeX book class, with Chinese front matter, chapters, contents, and editable mathematics.

Cuerna
A side-tab Beamer theme with vertical section navigation down the left margin, distinct from ruled-header themes.

Cuisine Recipe Steps
Recipes laid out with each ingredient beside the numbered method step that uses it, using the cuisine package's recipe environment.

CUP Data Template
A starter for Cambridge University Press's Data/Math journal family (Glasgow Mathematical Journal, Data and Policy, Psychometrika and others), using the CUP-JNL-DTM class. Community-maintained via the Overleaf gallery, not an official CUP-issued kit — check your target journal's current submission requirements.

Curriculum Vitae
A two-column CV: a small-caps name header with right-aligned contact details, then each section's label sits beside its content, with a detail environment for dated entries.

Curriculum Vitae CI Boilerplate
A CI-friendly single-column CV starter with a separate data file and clear sections for profile, experience, education, skills, and projects.

CurrVita
A minimal, typographically careful CV built from labelled entry blocks with dates hanging in the left margin — one of the oldest CV packages on CTAN, still current.

CurVe
Rubric-based CV: each section is a separate file, input via \makerubric. Automatic multi-page rubric continuation repeats a section's title if it spans a page break.

Customisable Calendar with Events
A portable A4 calendar grid with an editable year, month layouts, colour palette, and example event markers.

Cute Elegant Assignment
A bilingual (Chinese/English) homework class with a clean header block, worked-solution environments, and built-in chemistry structural formulas. Verified to compile to a PDF rendering real Chinese glyphs and chemistry diagrams.

CV Generator Starter
A form-oriented CV starter with stable fields for profile, employment, projects, education, and technical skills.

CV and Motivation Letter Collection
A two-page application bundle combining a concise CV with a matching motivation letter and shared visual language.

Classic CV
A text-first curriculum vitae using the CTAN cv package, with profile, experience, projects, skills, education, and references sections.

CVsty
A minimal CV built on the CVsty package: a redefined section rule, a labelled date-prefixed entry list, and a specialisation headline. Compiles under plain pdflatex.

Daily Laboratory Book
A chronological lab notebook with dated entries, per-experiment sections and an auto-generated experiment index, built on the CTAN labbook class.

Daily Planner Calendar
A two-page "year at a glance" desk planner (six months per page, rows by weekday) for 2026, with real events bolded in their correct weekday cells. Generated via the yplan Perl script, plain tabular, no fontspec.

Dalhousie Thesis
A Dalhousie thesis starter with traditional title and abstract pages, contents, literature review, methods, results, discussion, and appendices.

Dapper Invoice
A billable-time freelance invoice: a dated table of hours at an hourly rate with a resolved subtotal, sales tax and total, plus bank-transfer details. Plain article-class LaTeX, no external class.

DARPA Technical and Cost Proposal
A proposal starter combining mission objectives, measurable success criteria, a phased work plan, risk controls, deliverables, and cost volume.

Data Science Tech Cover Letter
A one-page ATS-friendly data-science application letter with a compact contact header, evidence-led paragraphs, signature, and skills footer.

International Journal of Digital Curation (IJDC)
Article template for the International Journal of Digital Curation / IDCC conference, using the official ijdc-v14 class. Class not in this pipeline's TeX Live — vendored via docstrip. Check the journal's current submission requirements before you send a manuscript.

Deedy Resume/CV
The widely-copied one-page, two-asymmetric-column CV by Debarghya "Deedy" Das, in its open-font (Lato/Raleway) variant; class is vendored, fonts resolved from the TeX Live install already present.

Delvierre Journal Article
Delvierre journal articles, using the official class's modern layout with a graphical abstract, research highlights list, and corresponding-author footer. Verified to compile to a PDF with resolved, hyperlinked references.

Deutsches Museum Contribution
Deutsches Museum contribution articles, using the official class with EBGaramond/Lato typography and footnote-style citations. Verified to compile to a PDF (XeLaTeX) with a resolved bibliography.

Developer CV
A two-page developer/contractor CV with a colour banner header, tagged skill chips, rated skill bars and a dated experience list.

DFG Collaborative Research Centre CV
A LuaLaTeX collaborative-research profile with DFG-style personal information, degrees, career, research programme, outputs, funding, and service tables.

DFG Academic CV
A neutral DFG cross-program CV starter covering personal information, qualifications, experience, contributions, outputs, supervision, service, and circumstances.

DGUT Paper
A Chinese-language paper/report/assignment starter modelled on Dongguan University of Technology (DGUT) formatting conventions. Self-labelled unofficial by its author — check your department's current requirements before relying on it.

Diaz Essay
A plain-article humanities essay (centred title block, generous margins) with argued prose and a resolved bibliography.

Digital Minimal
A minimalist Beamer theme with a triangular notch on the frametitle bar, full-bleed colour section dividers, and a breadcrumb-style footline.

DIN 5008 Letter
An original German business-letter starter using KOMA-Script scrlttr2, with DIN 5008-oriented sender, reference, subject, enclosure and copy fields.

D&D 5e Sourcebook
A D&D 5th-edition sourcebook layout with monster stat blocks, read-aloud text boxes, sidebars, and item/spell headers — recreates the official rulebook look.

Dortmund Title Page Starter
An original full-bleed academic title-page starter with a strong colour band, vertical rule, and separate document-information page.

Dreuw & Deselaers Poster
Classic A0 conference poster built on beamer scaled up by beamerposter, in the style Philippe Dreuw and Thomas Deselaers introduced the package with.

droit-fr French Legal Thesis
A French legal-thesis starter using droit-fr's title page, legal hierarchy, verse numbering, contents, and BibLaTeX bibliography.

Die TeXnische Komödie (dtk)
Article template for Die TeXnische Komödie, DANTE e.V.'s German-language journal, using the official dtk class. LuaLaTeX required; ships with a real biblatex/biber bibliography (the class hardcodes biber). Check DANTE e.V.'s current author guidelines before submitting.

Dunn Family Recipe Book
A chaptered family cookbook starter paired with a small JSON recipe schema, table of contents, ingredient lists, and methods.

Durham
A content-first Beamer theme built from first principles (not derived from any existing theme), with accessibility and inverted-colour modes.

Dutch University Letter
A Dutch institutional letterhead built on uvaletter — department/visiting-address/reference-number masthead in a University-of-Amsterdam house style, distinct from the corporate and DIN letters already shipped.

E-Ink Planner
A high-contrast monochrome annual planner for e-ink tablets, combining a year overview, quarterly focus board, and daily notes page without colour-dependent information or external assets.

easybook
A ctexbook-based academic template for Chinese theses or books, with custom front-matter and TOC handling and sensible font defaults.

eBook
A book class starter combining prose, code listings and callout boxes, for a technical eBook.

eBook
A book class starter combining prose, code listings and callout boxes, for a technical eBook.

ECNU Homework
A bilingual-friendly XeLaTeX homework layout with a Chinese cover header, boxed requirements, mathematics, algorithms, and worked solutions.

Economics Journal Article Bundle
A portable economics working-paper starter with JEL codes, an empirical equation, regression table, and references.

Economic Journal
Economic Journal article starter with empirical-research metadata, identification methods, results, and declarations.

ECV
European-format CV with hyperlinked section targets. Pass the english class option explicitly — the class defaults to German section labels otherwise.

Edinburgh Maths Thesis (edmaths)
A University of Edinburgh School of Mathematics thesis or report — School title page, standard declaration, abstract, lay summary, acknowledgements, chapters and an appendix.

edunham Technical Resume
A concise technical resume starter with a readable profile, work history, selected projects, education, skills, and references sections.

einfart Minimal Article
A clean, minimal article class with careful typography and built-in CJK support -- the plain face of Jinwen XU's minimalist class series (paired with the colourful lebhart, already shipped as stylish-article).

Revista EJE Universidad ECCI
Bilingual Spanish/English EJE-style two-column article starter with methods, results, equations, tables, and references.

EJP Electronic Communications in Probability
Electronic Journal of Probability preprint starter using EJP metadata macros, MSC classification, theorem environments, and a plain bibliography.

Ekaia
Bilingual (Basque/English) article template for Ekaia, the UPV/EHU science and technology journal, using the official ekaia package. Check the journal's current submission requirements before you send a manuscript.

Journal of Electrical Bioimpedance
Two-column article template for the Journal of Electrical Bioimpedance, using the official elbioimp class with plain-bibtex vancouver-style references. Check the journal's current submission requirements before you send a manuscript.

Elegance Beamer
A full-bleed, colour-block Beamer theme with distinct title, section and slide background art and a minimal sans typeface.

ElegantBook
A polished book class with a cover page, coloured chapter styling and biblatex-driven bibliography support.

ElegantNote
A lightweight, themed lecture/reading-notes class from the ElegantLaTeX family, with theorem environments and a bibtex-backed bibliography.

ElegantPaper Working Paper
A clean working-paper / preprint starter using the ElegantLaTeX elegantpaper class.

ElMueller Formal Letter
A DIN 676 standard business letter built on dinbrief, with correct fold marks and window-envelope address placement.

elpres
A plain, minimalist electronic-presentation class independent of Beamer's frame model — headed and unheaded slide environments over a stretch-spaced article layout.

Elsevier CAS
Elsevier's newer CAS double-column journal style, using the official cas-dc document class. Distinct from the packaged elsarticle. Verified to compile to a PDF with a resolved bibliography.

elsarticle Academic Journal
Elsevier journal submissions, using the official elsarticle class. Verified to compile to a PDF with a resolved bibliography.

Elsevier Book
An editable Elsevier book-project starter with front matter, chapters, appendices, references, and the upstream elsevierbook class family.

Elsevier's elsarticle Document Class
Elsevier journal submissions, using the official elsarticle class. Verified to compile to a PDF with a resolved bibliography.

elzcards Business Cards
A two-sided studio business card imposed at the standard 3.5in x 2in size with editable front/back macros and crop lines.

EMISA Journal
EMISA International Journal of Conceptual Modeling article starter using the emisa class.

European Mathematical Society Magazine
A two-column mathematical magazine starter with a lead article, theorem callout, short notes, and references.

emulateapj (ApJ-style)
ApJ-style journal articles, using the emulateapj document class (a companion to aastex, built on revtex4). Verified to compile to a PDF with a resolved bibliography.

Engineering Mathematics Homework
An engineering homework starter with a cover page, Given/Solution boxes, worked equations, uncertainty, and reflection prompt.

EnvLab Envelope and Mailing Label
A printable envelope and mailing-label starter using EnvLab with automatic and manual address labels.

EPFL CHILI Poster (baposter)
An A0 landscape 4-column baposter conference poster: abstract/intro/references in a narrow left column, methodology with an architecture diagram and results table in a wide centre column, conclusion and a demo link on the right.

EPFL Thesis and Project Report
An IC EPFL thesis and project-report starter with title page, bilingual abstract, chapters, logos, and bibliography.

EPFL Thesis
An EPFL doctoral thesis template (based on the EDOC template) with the university's logo and jury-based French title page.

epyt
A warm gray/gold Beamer theme with selectable palette styles (alpha/beta/gamma/delta/zeta) via a single theme option.

Equity Research Analyst Report
A focused analyst-note starter with an investment view, operating snapshot, valuation table, catalysts, risks, forecast bridge, and disclosure checklist.

ERDC Technical Report
A formal field-pilot technical report using the ERDC class, with a cover page, executive summary, measurement table, results, equations, and handover checklist.

Erzurum Technical University Journal of Mathematics
Neutral mathematical research-article starter with theorem environments, proofs, equations, results table, declarations, and bibliography.

esami
An exam-construction package: shuffled multiple-choice answers, randomised numeric parameters, and per-question point tallies, built for generating several exam versions. Verified to compile to a PDF with zero LaTeX errors.

ESIEEcv
A French-convention CV (rubrique/sousrubrique sections, French labels throughout) built on the ESIEEcv package. Compiles under plain pdflatex.

Essaykit STEM Essay
A short STEM essay starter with a clear claim, styled evidence box, quotation, numbered method and linked sources, using the Essaykit package.

ETH Zurich Thesis
An ETH Zurich PhD dissertation template with the official Diss. ETH title page format.

Europass CV
The newer Europass CV layout (2013 revision) with cover-letter support, superseding europecv. Verified to compile to a two-page PDF.

Europass CV (2025)
The 2025 revision of the official Europass CV format, with a circular photo header, colour schemes and a CEFR language-proficiency table.

EuropeCV
The standard European Commission CV format (europecv class), with multilingual sectioning for work experience, education and language skills. Verified to compile to a two-page PDF.

Event Ticket Cards
A full imposed sheet of 8 sequentially numbered admission tickets (2x4 grid, cut marks, boxed borders) for an invented conference. Compiles via the ticket class.

evweek Weekly Calendar
A printable weekly focus calendar with day-by-day priorities, fixed commitments, notes, outcomes and a parking lot for deferred work.

exam-lite
A compact exam layout with per-question point tallies, a running point total and multi-part questions via a simple alinea macro.

exam-ltr
A multi-question-type exam builder: Multiple Choice, True/False, Fill in the Blank, Matching, Short Answer and Essay under one Question wrapper, with a student/teacher mode toggle and reproducible shuffled options. Verified to compile to a PDF.

exam-n
A degree-examination class with structured multi-field exam headers, per-question author attribution, margin part-marks with running totals, and a draft mode that inlines worked solutions. Verified to compile to a PDF.

exam-zh
A modern Chinese exam layout: title block, multiple-choice with letter answer marking, fill-in-the-blank, and worked problems with per-step partial-credit scoring. Verified to compile to a PDF with real Chinese glyphs rendering correctly.

exam
The canonical LaTeX exam class: numbered questions with points, nested parts, running header/footer, and a togglable inline answer key. Verified to compile to a PDF.

Execushares
A modern minimalist Beamer theme with a pixelated bullet motif, a progress bar and clean section dividers.

exercisesheets
A university exercise-sheet package: numbered sheets with points-per-exercise, nested subtasks, and a solutions toggle that auto-labels the sheet as an answer key. Verified to compile to a PDF under LuaLaTeX.

exesheet
An exercise/exam-sheet package with margin point-value boxes, a questions/answers output toggle for producing a student or correction copy, and margin grading notes. Verified to compile to a PDF.

Express
A clean, own-layout Beamer theme with a horizontal section navigation headline and a slim progress bar footline.

Expressive Resume
A matched resume and cover-letter pair sharing one visual language, with structured macros for experience, projects and awards. Not in TeX Live: this starter bundles Expressive.cls, ExpressiveResume.cls and Colors.sty. Verified to compile to a one-page PDF.

exsheets
Exercise sheets with question/solution environments, per-question points and a separate answer key generated by \printsolutions from the same source.

Formal Aspects of Computing
Formal Aspects of Computing article starter with formal-methods metadata, methods, equations, results, discussion, and declarations.

Family Wall Calendar
A 12-month family wall calendar with one column per household member and three real vacation date ranges highlighted in green. Compiles via the bundled famcal class (not in TeX Live).

FancySlides Presentation
A minimal Beamer subclass for short talks: colored pointed/framed slogan boxes instead of bullet-heavy frames, plus simplified title and thank-you slide commands. Deck content is original, not the CC-BY-NC-SA demo circulated online.

Fantasy / RPG Calendar
A calendar generator for fictional worlds — custom month lengths, weekday names, leap-year rules and recurring holidays. Ships pre-configured as the Forgotten Realms Calendar of Harptos (D&D 5e), 12 pages, one month per page.

Fanzeyi CV
A modern minimal CV with a dark sidebar and skill-level sliders, in clean Raleway sans-serif typography.

Fax Cover Sheet
A fax transmission cover sheet built on facsimile.cls — boxed to/from/date/page-count header and an optional note box, a genuinely different document type from a correspondence letter. Patched a version-skew bug in the page-count extraction (see README).

ffslides
Freeform slides with absolute-position text and graphics blocks placed by fractional page coordinates, not a frame stack.

FiBeamer Thesis-Defense Theme
A FiBeamer thesis-defense presentation starter with a title page, agenda, question, evidence, and discussion slides.

Fiction Publisher Book
A print-on-demand fiction starter with front matter, chapter structure, scene breaks, running heads, and editable back matter.

Financial Due Diligence Report
A practical M&A diligence starter covering executive findings, reported performance, normalized EBITDA, working capital, balance-sheet risks, open items, and transaction implications.

FITEE Research Article
Neutral FITEE research-article starter with technical metadata, methods, equations, evaluation table, discussion, and declarations.

fithesis
Masaryk University's extensible thesis framework (fithesis4), demonstrated with the Faculty of Informatics style.

Final Individual Lab Report FKekk UTEM
A final individual engineering laboratory report starter with theory, equipment, procedure, results, uncertainty, discussion, and conclusion.

Flacards Study Cards
A cut-and-print flashcard starter with independently editable front and back content and cutting grids.

Flashcard Study Set
An A4 double-sided study-card starter with topics, prompts, answers, and custom card labels.

Flowfram Newsletter
A flowing newsletter layout with a main story frame and fixed sidebar using the flowfram engine.

FluentCV LaTeX Starter
A content-first CV starter whose profile, experience, education, skills, and publications can be generated from structured data.

Focus Presentation
A minimalist Beamer theme emphasising content over chrome. Uses the nofirafonts option to stay on Computer Modern under pdflatex.

Folded Postcard
A physical 5.5x3.5in postcard mailing built on postcards.cls — one message side plus one address-label side (real barcode + flush-right recipient block) per recipient, read from a plain-text address list. A different physical medium from every letter in this batch, not just a different layout. Patched a real silent-blank-page bug in the class's own geometry (see README).

Formal Book Title Page
A full-bleed colour title page in the style of a formal hardback's front cover, continuing onto a copyright/imprint page.

FPHW Assignment
A compact homework/problem-set class with a titled header block (course, professor, due date) and boxed problem environments; class is vendored since it was delisted from CTAN.

Freelance Invoice (Simple)
A minimal, unstyled freelance invoice — hourly rows, a fixed-rate item row, and a flat-fee row, with running subtotals and a balance due computed automatically. Distinct from the already-shipped minimal-invoice: a different upstream author/class using dimen-register arithmetic rather than spreadtab.

Freeman Cover Letter
A cover letter for a journal paper submission, with author/ORCID header, abstract box, recommended-reviewer slots and originality declaration.

Freeman CV
Substitute for the original FreemanCV template (Vel/Plasmati), which is CC-BY-NC-SA and cannot be redistributed here. This is a different CV of the same kind: the upstream moderncv class, styled banking (right-aligned dates, no colour band).

French Invoice
A French invoice (facture) with per-line TVA computed via real fltpoint arithmetic (5.5% and 20% rates shown) and a Total HT/TVA/TTC breakdown, verified resolved against the item totals. French-language convention, not a translated template.

Friggeri Resume/CV
An A4 port of Adrien Friggeri's widely-circulated CV: a colored sidebar for contact/languages/skills alongside a dated two-column entry list; class is vendored, fonts resolved from the TeX Live install already present.

French Formal Letter
A French formal-letter starter using frletter, with French address and date placement, salutation, closing, and copy line.

Bologna Frontespizio Starter
A neutral bilingual Italian and English University of Bologna-style frontespizio starter.

Frontespizio Italian Thesis Page
An Italian thesis-frontispiece starter with generated companion-source support, university/course metadata, candidate and adviser fields, and editable thesis content.

Frostybee Modular Homework
A modular assignment starter with a cover block, revision history, grading scheme, note box, structured questions, and worked answers.

Florida State University Thesis
A Florida State University dissertation starter with approval, abstract, acknowledgements, contents, chapter scaffolding, and appendices.

FU Berlin Beamer
An FU Berlin Beamer class starter with a compact agenda, decision framing, evidence slide, and neutral closing slide.

Full Size Formal Letter
A full-featured letterhead built on the g-brief class, with hole-punch, fold and window-envelope marks plus a reference-number row.

La Gaceta de la RSME
The official class for La Gaceta de la Real Sociedad Matemática Española, a Spanish-language mathematics journal. Verified to compile to a PDF with resolved cross-references.

GAMM Archive of Students
GAMM Archive for Students preprint starter with class-specific title and author metadata, abstract, keywords, code-availability note, table, and bibliography.

Georgia Tech Thesis
The official Georgia Tech thesis/dissertation class, compliant with the Office of Graduate Studies Style Manual.

G&C Business Card
A restrained ten-up business-card grid for a studio or consultancy, with editable fields and QR link.

gcard Folded Greeting Card
A four-panel folded greeting-card starter using the gcard package, with front, inside, and back cover examples.

GeekPlux CV/Résumé
A bilingual Chinese/English CV built on moderncv's classic theme with xeCJK, so Chinese and English section headers and body text sit side by side in one document.

Gemini Poster Theme
Widely-forked beamerposter theme for A0 conference posters, with a clean sans-serif headline band and separator-column layout.

Generic Homework Template
A lightweight homework layout with auto-numbered and named question environments, lettered or numbered sub-parts, and an answer box helper.

Geode
A Beamer theme with TikZ-drawn low-poly 'mineral' backgrounds and six swappable named colour palettes.

Gerador de Certificados e Declarações
A printable Portuguese certificate and declaration starter with editable names, dates, wording, and signatures.

GERAD Working Paper
A Cahiers du GERAD working-paper starter using the gdweb class mode, with abstract, keywords, equation, results table, and discussion sections.

Gerhardt Academic Paper
An academic-manuscript starter with a Charter/Fira Sans font pairing, from Holger Gerhardt's academic LaTeX template set (Paper template only, simplified bibliography backend).

getwriting Journal Article
A readable, double-spaced getwriting journal-article starter with an editable equation, table, code block, and bibliography.

GHS Chemical Safety Sign
A large-format chemical safety board using editable GHS H- and P-statements.

Gijs Pennings Homework
A focused problem-set starter with course metadata, running headers, numbered problems, multi-part reasoning, solutions, and a resolved bibliography.

Goethe Thesis
A Goethe University modular thesis starter with front matter, chapters, a conclusion, and bibliography.

Goodman Business Card
An imposed sheet of 8 identical business cards (2x4) at true 3.5in x 2in size on US Letter, built with TikZ, ready to cut. Compiles to a single-page PDF.

GOST 7.32 Technical Report
A formal technical-report starter organised around purpose, tasks, methods, uncertainty, results, conclusions, and recommendations.

Gotham
A modern, extendable Beamer theme with a robust set of colour and font sub-themes.

GreenPark BUAA Beamer
A Beihang University (BUAA) Beamer theme with full-bleed campus photography, a deep-blue section index and full bilingual Chinese/English support.

gridslides
Freeform slides with blocks placed on an explicit x/y grid, plus step-by-step reveals — a layout Beamer's frame stack cannot express.

GZT Journal Article
French article starter for La Gazette de la Société Mathématique de France, with issue metadata, structured authors, theorem environments, and a boxed bibliography.

Hacettepe Logic Design Lab Report
A digital-logic laboratory report starter with specification, Boolean design, truth table, implementation evidence, and conclusion sections.

Hagenberg Thesis
A bachelor's/master's thesis starter using the hgbthesis class from the Hagenberg Thesis Document Collection (FH Oberösterreich, Hagenberg campus).

Harnon CV
Vertical-timeline CV with a custom framed leftbar for each role — a visual model no other packaged CV class uses.

Harvey Mudd Laboratory Report
A structured laboratory report starter with apparatus notes, reproducible procedure, data tables, analysis, uncertainty, and conclusion.

Hausarbeit Jura Essay
A German legal essay starter using hausarbeit-jura, with a formal title page, juridical section numbering, and an original analysis of proportionality in automated administration.

h_da Thesis
An h_da thesis starter combining the ClassicThesis typographic style with structured front matter, chapters, appendices, and bibliography.

HDU Thesis Cover Starter
A Chinese and English thesis-cover starter with author, programme, supervisor, and abstract fields.

Hebrew Cookbook
A bilingual Hebrew and English recipe-page starter with Unicode headings and ingredient/method grids.

Helsinki Computer Science Poster
An A0 computer-science poster with a three-column hierarchy, workflow callout, compact metrics table, limitations, and next steps.

Heriot-Watt MACS Letter
A clean academic department letterhead starter based on the Heriot-Watt MACS correspondence layout, with editable sender and recipient blocks.

HES-SO Lab Report
A university engineering lab report (HES-SO MSE style) with a title-page masthead, chapters for objective/method/results/discussion, code listings and data tables.

HFUT Graduate Thesis
A Hefei University of Technology (HFUT) undergraduate/graduate thesis in Chinese, with the university's official cover page, abstract, GB/T 7714 numbered bibliography, and sample chapters on figures, math and citations.

Hindawi Journals
Hindawi journal submissions, using the publisher's own article template and bibliography style. Verified to compile to a PDF with a resolved bibliography.

HIT Thesis (hithesis)
A Harbin Institute of Technology degree thesis — bilingual covers, Chinese and English abstracts with keywords, numbered chapters, and the required conclusions and acknowledgements sections.

HIT Report
A Harbin Institute of Technology-style experiment-report starter for a falling-sphere viscosity measurement, with observations, uncertainty analysis and bibliography.

HITSZ
A bilingual (English/Chinese) Beamer theme for Harbin Institute of Technology, Shenzhen, with a section-navigation sidebar and official emblem.

H-Letter
A configurable H-Letter business correspondence starter with a letterhead, reference line, recipient window, enclosure, and signature.

Homework Handout
A printer-friendly homework sheet with numbered problems, answer areas, and reflection.

HUST Beamer Theme
An unofficial HUST Beamer starter with a structured cover, section note, metric cards, and evidence slide.

HYlangtech Helsinki Poster
A three-column hylangtech helsinki poster starter for clear research communication.

IACR Communications in Cryptology
Article template for IACR Communications in Cryptology, using the official iacrj class (the same class also serves ToSC and TCHES via journal=). Check the journal's current submission requirements before you send a manuscript.

IAG Proceedings
Two-column IAG Proceedings paper starter with an abstract, keywords, equation, results table, acknowledgements, and numerical bibliography.

IARIA Lite
IARIA conference-paper starter using the classic-BibTeX-compatible iaria-lite class.

IARIA Journal Article
An IARIA publication article starter using the official iaria class, with a two-column author block, abstract, keywords, results table, and the class's resolved bibliography.

Imperial College Dissertation
An Imperial College London dissertation template with a small-caps titlepage, declarations of originality and copyright, and a Journal-of-Fluid-Mechanics-style bibliography.

IdeoType Book Compiler
A compact book-production starter showing structured manuscript content, transformation checks, and reproducible build notes.

IEEE Journals and Conferences
IEEE conference papers and journal articles, using the official IEEEtran class. Verified to compile to a PDF with a resolved bibliography.

IEEE PES Transactions
IEEE Power & Energy Society Transactions starter using the ieeepes style.

IIT BHU Thesis
An IIT (BHU) Varanasi thesis template — a working, multi-chapter example covering sectioning, equations, footnotes, nomenclature, figures, tables and a bibliography, with the institute's title page and declaration/certificate pages.

IIT Delhi Thesis
The official IIT Delhi thesis/dissertation class, covering PhD, MS, MTech, Dual and BTech title pages and an IITD-format bibliography.

Israel Journal of Mathematics (ijmart)
Israel Journal of Mathematics submissions, using the official ijmart document class (amsart-based). Verified to compile to a PDF with a resolved bibliography.

Intl Journal of Student Research in Archaeology
The official class for the International Journal of Student Research in Archaeology, patched to compile under this site's TeX Live (font resolution, XeTeX-incompatible microtype option, and bibtex-backend citation resolution). Verified to compile to a PDF with a resolved bibliography.

Independent Consulting Deliverables
A decision-brief starter for independent consulting work, with a mandate, findings table, options, staged action plan, assumptions, and handover.

Informe Project Report
A practical project report starter with an executive summary, measurable objectives, evidence table, limitations, and decision-ready recommendations.

InterPore Journal Article
An InterPore Journal research-article starter with article category metadata, authors, methods, results, data and code, funding, conflicts, and contributions sections.

Invoice (CC0)
A distinctively styled invoice ("yet another invoice template") — a dark accent-color recipient block, footnoted VAT-exemption note, bank details footer. Hand-verified item arithmetic: unlike the other invoice templates in this batch, the upstream table is typed values, not macro-computed. Patched a hard upstream tabu/longtable version-skew crash (see README).

Invoice Template
A compact letter-based invoice starter with sender and customer addresses, project fees, totals, payment instructions, and a closing signature.

IOP Publishing Journal
IOP Publishing journal articles, using IOP's own iopjournal class. Verified to compile to a PDF with a resolved bibliography.

IPG Internship and Project Report
A bilingual-ready internship and project report starter with context, activities, results, reflection, and handover sections.

ISCRAM Conference Paper
Conference paper template for ISCRAM, using the official iscram class, with bibtex forced instead of the class's default biber. Check the conference's current author guidelines before you submit.

ISEL Thesis Cover Starter
A neutral bilingual Portuguese and English thesis cover with abstract and contents scaffold.

ISI Delhi Essay
An essay with a cover block, problem-and-solution structure, evidence table, and references.

IsoDoc Cover Letter
A job-application cover letter built with isodoc's key-value interface, following ISO envelope-window layout conventions.

ISO Signs Safety Board
A landscape safety-board starter using ISO sign pictograms, three editable action captions, and operational-use guidance.

Italian Chemistry Laboratory Record
An Italian and English chemistry laboratory record with reagents, apparatus, procedure, measured runs, calculations, conclusions, and sign-off.

Itemized Invoice (GPL)
An itemized invoice built with invoice2 (a LaTeX3/expl3 package) — running net/VAT/gross totals computed automatically, with per-row VAT-rate overrides for mixed-rate orders (a zero-rated postage line alongside 20% items). GPL-3.0 upstream LICENSE included in the download.

ITMO English Essay Template
An English academic essay starter with GOST-style structure, synopsis, numbered sections, and bibliography.

JABS Research Article
Neutral JABS research-article starter with structured abstract, field methods, statistics, results, discussion, and declarations.

Jacobs Landscape Poster
Substitute for the original Jacobs Landscape Poster template (bardsoftware/Vel), which is CC-BY-NC-SA and cannot be redistributed here. Uses tikzposter, an upstream A0 landscape conference-poster class, styled with the Wave theme and Britain colour palette.

Jacopo Recipe
A two-column recipe card with italic ingredients on the left and numbered method steps on the right, framed by a rule-bordered title block.

JACoW
JACoW accelerator-conference proceedings papers, using the official jacow document class. Verified to compile to a PDF with a resolved bibliography.

Jake's Resume
The single most-copied ATS-friendly tech resume template of recent years: a compact, single-column layout with machine-readable text. Self-contained, no custom class. Verified to compile to a one-page PDF.

Jambro
A minimalist Beamer theme with hand-drawn TikZ annotations, pencil underlines, sketched arrows and speaker-note callouts.

Modern German DIN Letter
A modern German DIN-style business letter with a window-envelope address block, typographic masthead, references, enclosure and copy fields.

Journal of Australian Postgraduate Research Article
A neutral postgraduate research article starter with abstract, keywords, mathematics, tables, and references.

Journal of the Brazilian Chemical Society
A Journal of the Brazilian Computer Society submission starter with journal metadata, keywords, ethics and reproducibility statements, results table, and references.

Journal of Computational Literary Studies
Computational literary studies article starter with text-analysis metadata, methods, results, availability, and contribution statements.

Journal of the European Economic Association
JEEA article starter with theory/econometrics metadata, methods, results, and reproducibility declarations.

Jerphanion Thesis
A report-based thesis starter with theorem/definition/proof environments, a glossary, and TikZ available for figures.

JHU Dissertation Title-Page Starter
A neutral Johns Hopkins-inspired dissertation title page with abstract, contents, and chapter scaffold.

JIMIS Article
A French JIMIS-style article starter with bilingual metadata, abstract and keywords, definitions, results table, discussion, and references.

JKU Technical Report
A chapter-based technical report starter with a structured abstract, table of contents, method, measured comparison, and explicit next steps.

Journal of Law, Economics, and Organization
JLEO article starter with law-and-economics metadata, methods, results, and declarations.

Japanese jlreq Article
A Japanese jlreq article starter with Japanese title matter, abstract, equation, results table, and references.

jlreq Japanese Book
A Japanese book starter using the jlreq document class, with Japanese text, structured sections, and editable mathematical content.

JMLR / PMLR
Journal of Machine Learning Research articles (the same class also typesets PMLR proceedings via its [pmlr] option), using the official jmlr class. Verified to compile to a PDF with a resolved bibliography.

Journal Article
Substitute for the original CC-BY-NC-SA 'LTJournalArticle' (Vel, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a two-column journal-style article of the same kind: episanty/AuNaturel, MIT.

Journal Reviewer Response Letter
A point-by-point response letter to journal referee comments, with boxed comments, an editor cover letter, and highlighted manuscript changes.

JSON Resume LaTeX Starter
A compact, text-first CV starter organized around JSON Resume sections for basics, work, education, skills, and projects.

jura German Legal Term Paper
A German legal term-paper starter with a case background, legal question, structured analysis, proportionality discussion, and conclusion.

jwjournal Personal Diary
A personal diary/journal writer with dated, colour-coded entries and a lightweight markdown-like text syntax. Not an academic-journal class despite the name.

Journal of Zhejiang University--SCIENCE A
Neutral Journal of Zhejiang University--SCIENCE A article starter with affiliations, classification metadata, methods, results, and references.

Kalender German Year Calendar
A German year-calendar starter using Jörg Söhner's legacy Kalender package, with the year generated from one editable macro.

Kaobook
A wide-margin book/notes class with a mini table of contents, sidenotes and margin figures, powered by KOMA-Script.

Kcao Bilingual Resume
A bilingual-ready XeLaTeX resume starter with paired headings, experience, education, skills, and project sections.

KDP Cover Title Page Starter
A KDP-oriented book cover and title-page starter with editable trim guidance, colour bands, title block, and book metadata.

KFUPM Math Exam
A KFUPM-style exam cover page and layout with a student ID block, version code box, numbered instructions and a running header. Patched to fix a real upstream bug where the student cover page ignored the course/exam-title/date class options entirely. Verified to compile to a PDF.

KIT Anfängerpraktikum Protocol
A compact German Anfängerpraktikum report with experiment goal, theory, measurements, calculation, uncertainty discussion, and sign-off.

KIT Physics Praktikum Protocol
A German P3/P4 physics practical protocol with apparatus, procedure, measurements, damped-oscillator evaluation, and error discussion.

KMBeamer (Blackboard)
A dark chalkboard-style Beamer theme (Blackboard) with a wooden frame and a hand-drawn chalk footer, from the kmbeamer theme collection.

K. N. Toosi Thesis (Persian)
K. N. Toosi University of Technology thesis template for Persian-language theses (xepersian), with a Persian-collated glossary, acronym list and bibliography via xindy and bibtex8.

KOMA ModernCV Classic
Brings the moderncv "classic" theme to KOMA-Script classes, for full scrlttr2 and biblatex compatibility. Verified to compile to a two-page PDF.

KOMA-CV
KOMA-Script-based CV class with classic, casual and oldstyle layouts and optional scrlttr2 letter integration. Verified to compile to a two-page PDF.

KorigamiK Assignment
A university assignment/homework starter with a designed cover page: boxed title, corner label, optional logo, and a name/roll-no/semester/course table.

ko.TeX oblivoir Korean Book
A Korean book starter using the ko.TeX oblivoir class, with Korean prose, chapters, contents, and editable mathematics.

KU Front Page Starter
A clean university-style report front page with colour bands, editable faculty label, title block, and document information.

KULAK Article Essay
A Dutch academic-writing starter with programme metadata, structured argument, key terms, and references.

Laboratory Notebook Daily Entry
A daily laboratory notebook entry for experiment identity, safety checks, observations, measurements, and follow-up actions.

Laboratory Notes Template
A project-oriented laboratory notebook with an active-project register, tentative ideas, dated notes, measurements, and a weekly review.

Scientific Writing Lab Report
General scientific laboratory report starter separating research question, reproducible methods, observations, analysis, uncertainty, and limitations.

Laboratory Notes Template (Klassen/Mount)
A project-oriented laboratory notebook with a dashboard, open actions, dated entries, measurements, interpretation, and review prompts.

Laborbericht Werkstoffe III
Ein deutschsprachiger Werkstofftechnik-Laborbericht mit Aufgabenstellung, Grundlagen, Versuch, Messwerten, Auswertung und Fehlerbetrachtung.

Lachaise Assignment
Substitute for the original Lachaise Assignment template (Vel/mursisoy), which is CC-BY-NC-SA and cannot be redistributed here. Uses homework, an upstream problem-set class with numbered problems, solutions, proofs and QED marks.

LALIC Beamer
A neutral LALIC Beamer starter with agenda, context, result table, and contact closing slide.

langsci
The Language Science Press book class in minimal mode, for open-access monograph and edited-volume production.

Modular LaTeX Cookbook
A modular cookbook with one recipe per file, a full-bleed photo, servings/prep/cook-time header, and ingredient + numbered-step columns.

LaTeX Cookbook
A LuaLaTeX cookbook starter with structured recipes, technical tables, calculations, bibliography, and release checks.

LaTeX Fancy Book
A self-contained mathematical book starter with a clean title page, contents, coloured theorem environments, and editable chapter structure.

German Service Invoice
A German service invoice with sender and customer data separated into invoice-data.tex, automatic itemized totals, discount, payment deadline and bank details.

LaTeX Resume Generator Starter
An ATS-friendly resume starter with a plain, modular layout that can be populated by compact, engineering, or data-science generator variants.

LaTeX Templates Business Cards
A portable ten-up business-card grid with a bold masthead, editable contact fields, and QR destination.

LaTeX Theme4PDF Book
A configurable book master separating publication variables, theme files, front matter, main matter, and back matter.

latexcv
The 'classic' style from a family of several visually distinct CV templates in one repo (modern, sidebar, infographic and more — see this starter's README for the others).

Layout Lettera Motivazionale
An Italian motivation-letter layout with localized addresses, subject line, salutation, experience highlights, and enclosure note.

Leadsheets Songbook
A leadsheet starter with song metadata, chord changes, numbered verses, and chorus formatting.

Legrand Orange Book
Substitute for the original CC-BY-NC-SA 'The Legrand Orange Book' (Mathias Legrand, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a general multi-part book template of the same kind: Pseudomanifold/latex-mimosis, MIT, restructured with parts, a preface and chapter epigraphs rather than thesis front matter.

Leouieda Academic CV
Data-driven academic CV: personal details and coauthor citation keys are macros defined once, so citation text stays consistent across the document. Rare permissive (BSD) licence in this category.

letgut Newsletter
A LuaLaTeX letgut newsletter starter with local editorial and bibliography inputs, a contents page, announcement box, code listing, book review, and resolved references.

Letter of Notice
A tenancy notice letter built on KOMA-Script scrletter, styled with a Libertine letterhead adapted from the latex-briefvorlage layout.

Letter to Reviewers
A point-by-point journal response letter with boxed reviewer comments, author responses, cover note, and change summary.

Lettre (French Letter)
A job-application cover letter following French letterhead and closing conventions, on the standard LaTeX letter-class interface.

Liederbuch Songbook
A reusable songbook starter with metadata, numbered strophes, and deferred song printing.

LIG Research Poster
An A0 three-column research poster with an evidence-path diagram, uncertainty-aware results table, limitations, and a prominent take-away.

LimeCV
Key-value driven modern CV class with a coloured sidebar, skill bars and language ratings. Falls back to fontawesome5 automatically under pdflatex; verified to compile to a one-page PDF.

Living Journal of Computational Molecular Sciences
A LiveCoMS article starter with article-type metadata, reproducibility-focused methods, data and code availability, author contributions, and BibTeX references.

LiX
A thesis class from the LiX family, a meta-package bundling formatting, figures, tables and bibliography handling into one document.

Springer LNCS Proceedings Article
Springer Lecture Notes in Computer Science proceedings papers and monograph chapters, using the official llncs class. Verified to compile to a PDF with a resolved bibliography.

La Mecatrónica en México Article
A bilingual La Mecatrónica en México article starter with Spanish and English abstracts, journal metadata, an equation, results table, and author biographies.

Lecture Notes in Informatics (LNI)
The official class for Gesellschaft für Informatik's Lecture Notes in Informatics (LNI) series. Verified to compile to a PDF with a resolved bibliography using the bundled LNI citation style.

LoLaTeXcv
A section/subsection/description-list CV with a compact dated-entry environment and dotted-leader timeline rows.

Long-Form Recipe Cards
A deliberately long recipe (braised short-rib ragu plus a from-scratch stock sub-recipe) with a wrapped ingredients table, numbered steps, a make-ahead suggestion and a hint callout. Compiles via the xcookybooky class.

Long Invoice
A XeLaTeX invoice starter with a multi-page-safe longtable, repeated column headings, client metadata, VAT summary, and payment instructions.

Los del DGIIM Exercise Worksheet
A Spanish-language exercise and exam worksheet with instructions and scoring.

Logic and Philosophy of Science
The official class for L&PS – Logic and Philosophy of Science. Verified to compile to a PDF with a resolved bibliography; kept short to avoid a real class bug found while packaging (see README).

LRP2020 White Paper
An evidence-led white-paper starter for a problem statement, proposed approach, assumptions, implementation roadmap, and decision.

ltx-talk
A presentation class from the LaTeX team, independent of Beamer, built for accessible/tagged PDF output.

LUDUS Journal Article
A two-column starter for the LUDUS International Journal of Game Studies, using the ludusofficial class. Community-uploaded to the Overleaf gallery by three named individuals, not published by LUDUS itself — check the journal's current submission guidelines before relying on it.

Luka Mihailović Resume
A compact technical resume for software and engineering applications with quantified experience bullets.

Luleå TVM English Report
An English technical-report starter with abstract, requirements, approach, verification results, discussion, and recommendations.

Lund University Thesis Starter
An Apache-licensed Lund University PhD thesis starter with front matter, a kappa, papers, appendices, and per-paper references.

Magaz Newsletter
A magazine-style newsletter starter with a lead feature, pull quote, short dispatches, and a contents strip.

Magazine-Style Newsletter
A newspaper-style multi-column magazine (three-column articles, drop-in pull-quotes, table of contents) with three original articles as separate includable files.

Maggi Memoir Thesis
Substitute for the original CC-BY-NC-SA memoir-class thesis (Vel/bardsoftware, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a thesis template of the same kind: Pseudomanifold/latex-mimosis, MIT, with a declaration-of-authorship page, chapter epigraphs and margin notes.

Mail-Merge Form Letter
A mail-merge form letter built on formlett — one letter body with numbered placeholder fields, rendered once per recipient from a plain-text data list, producing one PDF with one page per recipient (3 shown). A different feature from every other letter in this batch: batch-personalised correspondence, not a single addressee.

Mail-Merged Business Cards
A spreadsheet-driven XeLaTeX workflow that turns contact rows into QR-enabled business cards on an A4 sheet.

Mailmerged Conference Name Cards
A spreadsheet-driven XeLaTeX workflow for producing QR-enabled conference name cards on an A4 sheet.

Makoto Technical Report
A sans-serif engineering technical report (root-cause analysis format) with an abstract, investigation narrative and a validated-fix recommendation.

makyo Building a Book
A memoir-based multi-file book starter for drafting, proofing, and preparing a printable manuscript.

Malaysian Journal of Mathematical Sciences
Neutral mathematical article starter with subject classification, theorem and proof environments, equations, numerical results, and references.

Markdown to Book
A 6 × 9 inch XeLaTeX paperback starter for a Pandoc/Markdown-to-KDP workflow, with trim, gutter, front matter, chapters, and a release checklist.

Masaryk Bohunice Campus Letter
A Masaryk University Bohunice campus letterhead with reference metadata, contact details, carbon copy, and enclosure fields.

Masaryk Centre for International Cooperation Letter
A Masaryk University Centre for International Cooperation letterhead with reference fields, carbon copy, and enclosures.

Masaryk Faculty of Arts Letter
A Masaryk University Faculty of Arts letterhead with reference fields, carbon copy, and enclosures.

Masaryk Technology Transfer Letter
A Masaryk University technology-transfer letterhead with reference metadata, contact details, carbon copy, and enclosure fields.

Masaryk Telč Centre Letter
A Masaryk University Telč centre letterhead with reference metadata, contact details, carbon copy, and enclosure fields.

Masters/Doctoral Thesis
Substitute for the original CC-BY-NC-SA Masters/Doctoral Thesis (Vel, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a minimal, modern thesis template of the same kind: Pseudomanifold/latex-mimosis, MIT, structured with front matter, numbered chapters and a bibliography.

MATAPLI
French MATAPLI journal article starter using the matapli class.

Material Design
A flat-card Beamer theme implementing Google's Material Design language, with light/dark modes and swappable primary/accent palettes.

Math Homework Class
A clean class for math problem sets with numbered problems, solutions and QED tombstones. Verified to compile to a PDF; the class is bundled because an unrelated CTAN package shares its filename.

mathexam
A maths-exam package with a running header, boxed instructions, and controllable ruled or boxed answer space after each question. Verified to compile to a PDF.

MathsCodeBook
A mathematics-and-code book starter with theorem statements, proofs, exercises, Python listings, tables, and an appendix.

McDowell CV
A compact, single-column CV class in the style popularised by Gayle McDowell's 'Cracking the Coding Interview'.

Medium Length Graduate CV
Substitute for the original Medium Length Graduate CV template (Vel's res.cls), which is CC-BY-NC-SA and cannot be redistributed here. This is a different CV of the same kind: the upstream moderncv class, styled casual with a green accent.

Medium Length Professional CV
Substitute for the original CC-BY-NC-SA 'Medium Length Professional CV' (Vel, LaTeXTemplates.com), which cannot be redistributed here for licensing reasons. This is a two-column CV of the same kind: deedy/Deedy-Resume, Apache-2.0, using its bundled open-font (Lato + Raleway) variant.

Memo Template
A professional internal memo starter with To, From, Date, Subject, decision-request, action-list, and attachment fields.

memoir
A highly configurable book, report and article class, used here for long-document structure such as theses.

Menu Template
A printable restaurant menu with a framed masthead, section rules, priced dishes, descriptions, and an accessibility note.

Meowmeow Cheatsheet
A compact bilingual two-column study-sheet starter with core concepts, formulas, data structures, checklists, and practice space.

Mechanical Engineering Publications
Mechanical Engineering Publications article starter with engineering metadata, methods, equations, results, and declarations.

Metropolis
A minimal, high-contrast Beamer theme with an optional progress bar, built for content over decoration.

METU Thesis
A METU graduate thesis starter with editable title pages, abstract, acknowledgements, chapter structure, equations, comparison tables, and appendices.

mhchem Chemical Warning Signs
A chemical storage warning board with editable formulae and handling reminders.

Minimal Academic Beamer
A clean, minimal Beamer theme with a boxed title card, green section rules and quick logo/colour rebranding commands.

Minimal CV
A one-page poster-layout CV: a dark header band, a light contact/personal sidebar, and a main column for education and experience, illustrated with hand-drawn vector icons and flags instead of photos.

Minimal Invoice
A minimal freelance invoice with an itemized services table (spreadtab-computed subtotal, VAT and total in the upstream), a closing note and a signature line. Compiles to a PDF with a resolved, correct total.

Minimalist Academic Book
A restrained monograph starter with front matter, chapters, theorem-like statements, bibliography, appendix, and index-ready structure.

Minimalist Book Title Page
A deliberately minimal book title page — no rules or logos, just generous whitespace and three lines of type — continuing onto a dedication page.

Minimalist Invoice
A clean A4 invoice starter with a compact sender and recipient header, striped item table, payment terms, and prominent total.

Mirage
A dark charcoal/pink/blue Beamer theme (with a light-mode option), the most visually distinct entry in this batch.

MIT Architecture Thesis Title-Pages Starter
A neutral architecture-thesis front-matter starter with acknowledgements, abstract, and degree fields.

MIT-BECL CV Resources
An academic research CV starter covering interests, appointments, publications, teaching, awards, and skills.

MIT Thesis
The official MIT Libraries thesis format (mitthesis), with a biblatex bibliography, cover-page and font-set options for a thesis of any type.

MNRAS
Monthly Notices of the Royal Astronomical Society articles, using the official mnras class. Verified to compile to a PDF with a resolved bibliography.

Modern Class Notes
A worksheet-mode class with colour-palette callout boxes for exercises, solutions and proofs, and a class option to hide solutions for a student handout.

Modern Resume Template
A modern two-column resume starter with a pale skills sidebar, experience timeline, education, and selected project sections.

ModernCV CV and Cover Letter
The upstream moderncv class itself (not a derivative), styled classic, with a matching cover letter using the same personal details. Six built-in styles and nine colour schemes are a one-word change, documented in the starter's README.

Modern Newspaper Newsletter
A Unicode-first newspaper newsletter with issue metadata, masthead, drop caps, and three news columns.

modernposter
A0 portrait poster with a metropolis-inspired dark teal header and boxed sections, built on a0poster.

Modular Faculty Application
A modular academic faculty-application packet with cover letter, research statement, teaching statement, and CV sections.

Moloch
A clean, minimalistic fork of Metropolis with a less opinionated default look.

Mon Master Motivation Letter
A French Mon Master motivation letter with academic fit, goals, experience, and formal closing sections.

Month Planner
A landscape five-week weekly planner with a focus column, daily slots, objectives, and results prompts.

Monthly Calendar LaTeX Template
A self-contained landscape monthly calendar with an editable date grid, daily notes, and priorities panels.

Monthly Calendar
A full-year wall planner grid (12 rows x ~31 columns) with real 2026 events marked on their correct weekdays. Compiles to a landscape PDF via the wallcalendar class.

Monthly Desk Planner (TikZ)
A landscape monthly desk planner drawn entirely in TikZ's calendar library, with Focus/People-to-see/Places-to-go/Not-to-do-list side panels and Personal/Work-projects plus Notes strips. Ships pre-set to March 2026.

Mood Tracker Template
A simple monthly mood tracker with editable colours, dated marks, a legend, and reflection prompts.

MooersLab Compact Poster
Compact, image-forward A1 scientific poster with a large finding panel, adaptive-sampling diagram, metrics, and a readable three-column research narrative.

MooersLab Research Diary 2023
A modular annual research diary starter with month chapters, dated experiment entries, raw-measurement tables, comparison decisions, and an annual plan appendix.

MooersLab Research Diary 2024
A compact annual research diary starter with month chapters, dated laboratory entries, measurement tables, review prompts, and a searchable subject index.

Morgana Recipe
A thin two-column recipe card with a bold red tagline and category heading above the ingredients/method columns and a nutrition callout.

Mostra IC Portuguese Poster
A three-column mostra ic 2024 starter for clear research communication.

MSU-IIT Certificate of Panel Approval
Neutral panel-approval certificate with editable project, candidate, panel, and date fields.

MSU Thesis
A memoir-based thesis class tracking Michigan State University's Graduate School formatting guidelines.

MTBE Book
A compact plain-TeX book starter with the MTBE chapter, section, subsection, and page-furniture macros.

Mensch und Computer Proceedings
Mensch und Computer proceedings starter with structured abstract, author metadata, tables, and the class's biblatex bibliography workflow.

MUL Poster
A high-contrast A0 scientific poster with an institutional-style header, three columns, a result callout, comparison table, limitations, and next steps.

Multi-Size Sudoku
A multi-size Sudoku worksheet showing editable 4x4 and 9x9 grids with configurable cell length, font size, and rule thickness.

Multilingual Invoice
A multi-project consultancy invoice built on the invoice package — fees per project with computed VAT, local expenses, and foreign-currency expenses that the class itself converts at a stated exchange rate. Column labels can be localized into 10 languages via a package option. Every subtotal and the final total are computed by the class, verified against the line items.

Multilingual Wall Calendar
A full-page A4 12-month wall calendar with dated single- and multi-day events with icons, mini prev/next-month strips, and a cover page. Localisable via babel/translator/datetime2. Ships pre-set for 2026.

mwart Polish Article
A Polish-oriented alternative to the standard article class, part of Marcin Wolinski's MW bundle. Starter is written in Polish with babel+polski for genuine localisation.

Myletter Formal Letter
A configurable business-letter starter targeting the myletter compatibility alias for akletter, with contact fields and enclosures.

Naereen Magic Business Card
A dark, high-contrast ten-up business-card sheet with a vertical accent and QR contact link.

Nanjing University Report
A bilingual coursework-report starter with problem statement, method, equations, evaluation table, discussion, and conclusion sections.

Nankai Laboratory Report
A general chemistry laboratory-report starter for an acid--base titration, with concordant readings, calculations, uncertainty and discussion prompts.

Nature-Style Article (Third-Party)
Third-party template imitating Nature's article style — NOT an official Springer Nature template. No licence statement found in the class (recorded as UNKNOWN). Check nature.com for the journal's actual current submission requirements.

Navy Technical Report
A Navy-style technical-report title page and systems-readiness report starter with formal distribution metadata, contents, readiness measures, and an acceptance sequence.

NemoCalendar
A compact editable planning-calendar starter documenting the public-domain NemoCalendar generator and its generated LaTeX workflow.

NewLFM Cover Letter
A US business-letter (busletter) style cover letter using newlfm's from/to macro set — the same class also covers fax cover pages and memos.

Newsletr Newsletter
A compact newsletter starter using a masthead, issue date, short articles, and a notice column.

Newsletter Template
A compact three-column newsletter starter with a masthead, datelines, pull quotes, dispatch boxes, data table, calendar, and modular editorial sections.

Newspaper and News Letter Template
A newspaper-style newsletter starter with issue metadata, headline hierarchy, columns, and an announcements panel.

Newspaper Newsletter
A three-column newsletter starter using the newspaper package, with masthead, issue metadata, byline, headlines, results table, and noticeboard.

NIH Biosketch
Implements the NIH's mandated grant-application biographical-sketch format. Bundles a one-line-patched class (Arial -> DejaVu Sans; upstream's hardcoded font is not installed on most systems).

NIME Proceedings
A portable NIME proceedings starter with conference metadata, compact authorship, CCS concepts, keywords, a two-column layout, and workshop results.

NJU Thesis Starter
A Nanjing University undergraduate, graduate, and postdoctoral thesis starter with Chinese and English abstracts, contents, references, and appendices.

NKThesis (Nankai University)
Nankai University's official master's/doctoral thesis class (NKThesis), with the GB/T 7714-2015 bibliography style and bilingual Chinese/English title page.

NKU Chinese Course Paper
A Chinese course-paper layout with numbered headings, research questions, methods, findings, and conclusion.

NKUST Thesis
A bilingual-ready NKUST thesis starter with title pages, declarations, literature review, study design, appendices, and references.

Nord
A simple Beamer theme built around the Nord colour palette, with separate outer, inner and font sub-themes.

nostarch
A technical-book class in the style of No Starch Press's own books, independently LPPL-licensed, with a formal title page, copyright page, and a real index.

Nova Thesis Starter
A multilingual NOVA University thesis and dissertation starter with configurable covers, chapters, references, and appendices.

novel
A LuaLaTeX class for print-on-demand fiction — trim size, PDF/X output, running heads, chapter openings and scene breaks.

NPBT Beamer
A university-branded Beamer theme (NPBT) with a full-bleed watermark titlepage and a teal accent rule under every frame title.

NTGClass Article
A clean NTG artikel1 research-article starter with an abstract, equation, editable results table, and BibTeX bibliography.

NTNU Article-Based PhD Thesis
An article-based (compilation) NTNU PhD thesis template: a synopsis followed by the constituent papers reproduced in full.

NTU Thesis
Nanyang Technological University (NTU Singapore) PhD/Master's thesis template, with originality/supervisor declarations, abstract, and author-attribution statement.

NUSRI Chinese/English Lab Report
A Chinese/English-oriented laboratory report starter with apparatus, procedure, measured results, uncertainty, discussion, and sign-off sections.

NUTT Newcastle Thesis
A modular Newcastle University PhD thesis starter with front matter, chapters, appendices, nomenclature, and bibliography.

North-Western European Journal of Mathematics
Author-facing article starter for the North-Western European Journal of Mathematics, with tagged affiliations, MSC metadata, theorem, table, and a BibLaTeX bibliography.

octavo
A book-class fork implementing classical Tschichold/Rosarivo page proportions, nine historical trim sizes, and signature imposition for hand bookbinding.

Octree White Paper
A compact white-paper starter with an executive summary, findings, recommendations, risks, and roadmap.

OER bookdown Textbook
An open-textbook starter with learning goals, examples, activities, tables, publishing paths, and revision notes.

OIST Lab Rotation Book
An original lab-rotation notebook starter for recording objectives, dated observations, measurements, controlled comparisons and handoff actions.

omgtudoc-asoiu Article
A Russian technical-article starter using omgtudoc-asoiu with an abstract, equation, results table, and conclusions.

OnlineBrief24 Letter
A modern DIN 5008 business letter built on onlinebrief24 (calibrated against the onlinebrief24.de hybrid-mail service). Ships with the class's `guides` overlay ON, showing the real DIN 5008 zone geometry, fold marks and address-window boundaries directly on the page — a technical inspection mode most users will turn off, kept on here so the geometry is visible in the preview.

Open-Book Exam Cheat Sheet
A compact seven-column A4-landscape exam reference sheet with colour-coded headings, formulas, statistical definitions, workflow checklists, and writable space.

OpenCurVe Resume
A CJK single-page resume with an icon-linked header, photo box, and coloured brand-banner employer blocks, built on the CurVe class.

Opieters Business Card
A QR-enabled Northstar business card starter imposed as ten standard 86 x 54 mm cards on A4 for cutting and printing.

SPIE Optical Engineering Article
A SPIE Optical Engineering manuscript starter with journal-mode metadata, subject terms, a compact two-column layout, equation, table, figure placeholder, and references.

OrCalendar 2026
An editable year-at-a-glance calendar with six-month pages, event markers, and space for notes.

University of Oregon Poster Template
A self-contained A0 research poster with a three-column hierarchy, decision-focused evidence path, results table, and configurable Oregon-inspired palette.

Minimal RPG Zine Template
A minimal two-column, binding-aware RPG zine starter for folded booklet printing.

OtterCV Application Bundle
A multi-page OtterCV-style application packet combining a motivation letter, curriculum vitae, and optional attachment index.

OU TMA
An Open University Tutor-Marked-Assessment layout with an auto-numbered question/part/sub-part hierarchy and maths-notation helpers. Verified to compile to a PDF.

OUP Authoring Template
Generic Oxford University Press journal submissions, using OUP's official oup-authoring-template document class. Verified to compile to a PDF with a resolved bibliography.

Overhead Foils Slides
Large-format overhead transparencies in oversized sans-serif type, using core LaTeX's slides class, the LaTeX2e successor to SliTeX. Verified to compile to a PDF.

Overleaf-Themed Dodecahedron Calendar
A geometric two-page monthly planner with editable polygon calendar facets and year-end notes.

Overleaf Physics Book Template
A classic physics-book starter with running heads, chapter styling, dimensional analysis, equations, and problems.

Owl
A true black-background, white-text colour theme on plain Beamer chrome — OLED-dark, no gradients or accent blocks.

Oxford Thesis (OxThesis)
The University of Oxford's DPhil/Master's thesis template (OxThesis), with the official belt crest title page.

Ozan Kiratli ATS Cover Letter
A clean ATS-readable application letter with a compact sender block, recipient address, focused evidence paragraphs, and a conventional signature.

Pandoc DIN 5008 Letter
A directly compilable DIN 5008-oriented KOMA letter based on a Pandoc Markdown workflow, with reference, customer, enclosure and copy fields.

Pandoc Novel
A print-ready 6 x 9 inch novel starter with front matter, running heads, chapters, and unnumbered back matter.

paper Article
A distinctive academic-article class with bold sans-serif title/headings against a serif body, subtitle and institution fields beyond plain article.

pas-crosswords Crossword Grid
A configurable crossword-grid starter using TikZ, with editable black cells and horizontal and vertical entries.

Pat's Resume
A dense single-column resume with GPA-optional education entries, a technical-role flag, inline tool tags per bullet, and Publications/Honours sections.

Pawan Joshee ATS Resume
A text-first ATS resume starter with predictable headings, dates, bullets, technical skills, experience, education, and projects.

Per Musi
Per Musi-style bilingual musicology article starter with double-blind author fields, abstracts, keywords, analysis, tables, and references.

PhD Thesis Front Matter
A complete PhD thesis front-matter sequence on the memoir class — title page, declaration, abstract, acknowledgements, contents, list of figures and list of tables — with the page geometry and chapter style set explicitly rather than inherited from any one university's thesis class.

PhD Thesis (Southampton)
University of Southampton PhD thesis template, with declaration, list of symbols/acronyms, and Python/algorithm code-listing support.

Philosophers' Imprint
Article template for Philosophers' Imprint, using the official philosophersimprint class with opcit/bibtex citations. Note: the class stamps a CC-BY-NC-ND notice on the output by default (the journal's real policy) — check the journal's current submission requirements before you send a manuscript.

Philosophy and the Mind Sciences
The official class for Philosophy and the Mind Sciences. Verified to compile to a PDF with correctly displayed authors and affiliations (stage=preparation set explicitly).

PhnomPenh
A high-contrast, deliberately loud Beamer theme with separately coloured title/author/institute/date blocks.

Photo Book
A visual book starter with trim and bleed settings, page-sized cells, image panels, captions, and a production colophon.

Physics 11422 Lab Report
An introductory physics laboratory-report starter with model, apparatus, data table, fitted analysis, uncertainty discussion, and conclusion.

Physics Book Template
A physics textbook starter with dimensional equations, boxed observations, worked examples, tables, and references.

PKU Physics Laboratory Report
A compact mechanics laboratory-report starter for measuring spring constants from oscillation periods, with fitted data and model evaluation.

Planetary Research Article
A Planetary Research article starter in review mode with uncertainty analysis, tables, and biblatex references.

Plantilla para un artículo LaTeX
A Spanish-language physics article starter with an abstract, figure placeholder, table, equations, lists, cross-references, and BibTeX references.

Plantilla Informe de Laboratorio 2023
Spanish university laboratory report starter covering objective, theory, procedure, measurements, uncertainty, analysis, and conclusions.

Plasmati CV
Substitute for the original Plasmati CV template (Alessandro Plasmati), which is CC-BY-NC-SA and cannot be redistributed here. Uses tccv, an explicit clean-room rewrite of the same two-column idea by Nicola Fontana, inheriting no non-commercial restriction.

PlayaCV Application Bundle
A complete application packet combining a cover letter, matching CV, and optional supporting-document index.

PLOS Article
PLOS-style article starter with structured abstract, methods, results table, data-availability and competing-interest statements, and Vancouver references.

PlushCV
A one-page, two-asymmetric-column resume with a coloured name header, small icon-labelled contact and references lines, built for computer science students.

Pmichaillat CV
Minimalist economics-academic CV with a distinctive small-caps section style, from a template author with a consistent house style across his own documents.

Poetry
A compact poetry-collection starter with numbered lines, stanza breaks, poem groups, and a generated list of poems.

PoetryTeX Book
An original short poetry anthology demonstrating title metadata, poem groups, a list of poems, centered poems and annotation sections.

polycv
Sidebar CV with skill-level progress bars, from a chemistry-academic origin. Bundles a one-line-patched class (fontawesome5 fixed mode; upstream's fontawesome v4 icons do not render on this system).

Pomona Linguistics Paper
A compact linguistics paper with reusable preamble conventions, numbered examples, and a quick-reference-style appendix.

Poster-mac Tiled Sign
A tiled workshop notice inspired by the poster-mac large-box banner workflow.

Powerdot FU Berlin Style
A Free University of Berlin Powerdot presentation starter with a title slide, agenda, question, evidence, and next steps.

Powerdot Presentation
Slide presentations with themes, overlays and handout modes, using the PostScript-native powerdot class. Builds via the latex-dvips route. Verified to compile to a PDF.

ppt-slides
A package layered over article that builds PowerPoint-style decks — click-through reveal, chapter dividers, banners and a running agenda — not a Beamer frame stack.

PRACE Research Infrastructure White Paper
A consortium-style research-infrastructure white-paper starter with a scientific case, service model, governance, sustainability, and partner decision.

PracTeX Journal Article
Practical, tutorial-style articles about TeX and LaTeX, using The PracTeX Journal's pracjourn class. Verified to compile to a PDF with a resolved bibliography.

Practical Lab Report
A physics lab report (pendulum measurement of g) using practicalreports' title-page, figure, table and boxed-answer macros over plain article.

Pretty Recipe Cookbook
A half-letter cookbook with a hyperlinked table of contents, chaptered sections, and a clean recipe layout — attribution, serves/prep/cook time, ingredients and a numbered method with an oven-temperature callout.

Principia Logic Book
A formal-logic book starter demonstrating Peanese connectives, scope dots, definitions, and substitutions.

Problem Set and Notes Essay
A mathematical notes and problem-set essay starter with a claim, equations, response block, uncertainty bound, and checklist.

Problem Set Template
A problem-set layout typographically tuned for online submission, with claim/proof environments and a shorthand package for common set/probability notation.

Professional CV
A photo-table CV with a two-column summary, personal-details table, timeline institution entries and a signature block.

Professional Formal Letter
A formal business letter built on KOMA-Script's scrlttr2 class, with a proper DIN-style letter head and folding-mark ruler.

Professional Internship & Company Report
A complete company-project report starter covering the business question, scope, delivery record, findings, limitations, reflection and handover checklist.

Professional Newsletter
A corporate newsletter with a masthead, a front-page contents line, two-column articles, a pull-quote box and a bordered sidebar for callouts.

Project Proposal Template
A project proposal for defining a problem, outcomes, workstreams, governance, dependencies, risks, and a decision gate.

Project Report Template 1
A structured project report with an executive summary, progress dashboard, workstream updates, budget view, risks, and next actions.

Project Report Template 2
A compact decision-oriented project report with outcomes, deliverable status, issues, decisions, recommendation, and forward plan.

Project Report
A two-column thesis/project report on sintr.cls, a repurposed journal class with running heads and a keyword+abstract block.

prometheusCV
A banner-header academic CV set in Cormorant Garamond, with a keyword line and dated entries for education, publications, honors and service.

PRTEC Conference Paper
Conference paper starter for the Pacific Rim Thermal Engineering Conference (PRTEC), using the official prtec class.

Pseudomanifold CV
A minimal single-column academic CV with small-caps headers and Tufte-style margin-note dates, set in EB Garamond.

Progress of Theoretical Physics (PTP)
Article starter for Progress of Theoretical Physics (PTP) and PTP Supplement submissions, using the official ptptex class.

Recipe Book
A small two-chapter recipe book (starters, mains) with four real recipes, each with a formatted ingredients block and numbered method. Compiles via the recipe class, which extends book.

PUC Minas Academic Article
A Portuguese academic article and essay starter with ABNT-like front matter, resumo, sections, and bibliography.

Pure Minimalistic
A stripped-back minimalist Beamer theme with optional dark mode. Includes a blank placeholder logo — swap it for your own.

Princeton Senior-Thesis Title-Page Starter
A neutral Princeton senior-thesis title page and introductory chapter scaffold.

Swiss QR-Bill Invoice
A two-page Swiss invoice: an itemized coffee-wholesaler bill with VAT-correct totals, followed by a real QR-bill payment slip (structured QRR reference, IBAN, scannable QR code). Compiles via the qrbill class.

Quantum Journal Article
Quantum journal articles, using the official quantumarticle class. Verified to compile to a PDF with a resolved bibliography.

Quarto DIN 5008 Brief
A DIN 5008-oriented German letter starter with a Quarto YAML workflow and a directly compilable KOMA-Script equivalent.

Questionnaire
Printable paper questionnaire with numbered questions, checkbox options, instructions, and ruled response space.

qyxf-book
A minimalist ctexbook-based class for Chinese course materials, with coloured theorem boxes and several colour schemes.

R&S Laboratory Safety Sign
A laboratory safety notice demonstrating the historical r_und_s advice macros.

Radboud University Essay
A short-paper essay report with report-style headings, half-spacing, an argument map, and bibliography.

Rainbow
A plain Beamer theme paired with the Rainbow colour theme: each new frame automatically advances through a 6-colour palette.

Random Report Template
A flexible language-neutral experiment report starter with overview, method, observations, analysis, evaluation, and conclusion sections.

Rapid Exercises Worksheet
A rapid-exercise worksheet for short algebra and function drills with a self-check.

hilbert
A book class for beautiful, non-technical books — half-title, full title, copyright, dedication, foreword and preface, with real front/main/back matter.

Revista Brasileira de Computação Aplicada
Portuguese and English RBCA-style article starter with bilingual abstracts, compact journal geometry, equations, tables, and numbered references.

Revista Brasileira de Economia Article
A Portuguese Revista Brasileira de Economia article starter with JEL codes, an abstract, an empirical specification, an estimates table, and transparent limitations.

Revista Brasileira de Física Article
Bilingual Revista Brasileira de Física article starter with Portuguese and English abstracts, compact journal geometry, equations, a measurement table, and numbered references.

Rctart Article
A Portuguese Rctart-style bilingual article starter with abstracts, keywords, two-column methods and results, equation, table, and references.

ReadableCV
A CV and matching cover letter in one document, with timeline role entries, itemised achievements, and a two-column skills grid.

Recipe Book
A chaptered cookbook starter with a title page, contents, recipe sections, ingredients, and methods.

Recipe Card Generator
A printable pure-LaTeX recipe-card starter with reusable card macros, servings, ingredients, method, and variation notes.

Recipe (Public Domain) Starter
A public-domain-inspired two-column recipe starter with servings, timing, ingredients, method, and kitchen notes.

RecipeBook Family Cookbook
A multi-recipe cookbook with a photo title page, hyperlinked table of contents, checkbox ingredient lists grouped by section, and numbered instructions.

Recipe Index Cards
Recipes laid out as note-card-sized boxes (3x5/4x6/5x7) with a two-column ingredient list and numbered method — cut out and glue onto physical index cards.

Recommendation Formal Letter
A recommendation-letter starter with sender and recipient blocks, evidence-based paragraphs, and a formal closing.

Reed College Physics 200 Report
A compact two-column physics laboratory report with abstract, method, measured data, equations, and uncertainty-focused discussion.

Relatese Technical Report
A scientific-report starter using relatese's layout, mathematics, SI-unit, table, reference, and cross-reference helpers.

Report Cover-Page Starter
A compact, editable report cover page with executive-summary and recommendations sections.

Res Philosophica
Article starter for Res Philosophica submissions, using the official resphilosophica class (amsart-derived, with journal metadata and DOI/copyright layer).

ReScience C Article
A ReScience C replication-article starter with separated metadata, reproducibility checkpoints, and bibliography.

Research Diary Template (Klassen)
A weekly research diary with intentions, dated evidence notes, literature tracking, falsifiable questions, and an end-of-week review.

Research Diary Template
A daily-and-weekly research diary with a week-at-a-glance plan, evidence prompts, dated entries, measurement tables, and a retrospective.

Research Journal Template
A dated research journal starter separating reading notes, experimental evidence, decision records, and a month-end review.

Research Lab Notebook
A running-log lab notebook (dated entries, not a report's method/results/discussion structure) with a title page, entry rules and inline data tables.

Restaruant Menu
A two-page restaurant menu with multilingual dish names, prices, descriptions, framed TikZ composition, and reusable section and entry macros.

Restaurant Menu Card
A one-page, three-course restaurant menu with real dish descriptions and consistent pricing, numbered mains, and a Zapf Chancery title. Compiles via the menucard class.

resumecls
The only CJK-capable CV class in the catalogue: built on ctexart, so Chinese and English render together with no extra packages. Requires XeLaTeX.

REUSE Cover Letter Template
A concise, maintainable one-page cover letter with a semantic contact header, evidence-led paragraphs, signature, and skills footer.

Review Response Letter
A structured response-to-reviewers starter with separate comment and response boxes, reviewer sections, and a change summary.

RevTeX 4.2
APS/AIP physics journal articles, using the official REVTeX 4.2 class. Verified to compile to a PDF with a resolved bibliography.

Reykjavik University Cover Pages
A two-page undergraduate or graduate thesis cover and declaration-page starter.

Rho Class Research Article
A self-contained two-column research-article class with STIX2/Fira typography and built-in note/info call-out boxes.

Risk Management and Compliance Audit
An internal-assurance report with an executive opinion, risk register, control testing, findings, ownership, and remediation roadmap.

Rover Resume
A no-custom-class ATS resume (the 'Star' variant) with rule-decorated section headers and right-aligned dates.

Royal Society Open Biology
Royal Society Open Biology article starter with biological methods, results, data availability, and declarations.

Proceedings of the Royal Society A
Neutral Proceedings A research-article starter with abstract, keywords, mathematics, tables, theorem statements, and references.

RPI Research Poster
A portable A0 research poster with a scarlet-and-grey institutional-style palette, workflow blocks, evaluation table, and signal chart.

Royal Society of Chemistry Article
Royal Society of Chemistry-style article starter with chemistry-oriented sections, equations, calibration table, figure guidance, and numbered references.

rticles Journal Article
A portable research-article starter reflecting the rticles journal-template family.

Radboud University Title Page
Radboud University-style title page with the official wordmark and shield, followed by the start of the document body.

RWTH i10 Thesis Templates
A neutral RWTH i10 thesis starter with English and German abstract hooks, chapter scaffolding, equations, evaluation tables, and appendices.

Saarland Beamer
An unofficial Saarland University Beamer theme with a subtle corner background watermark and a swappable institution logo.

SaaS Financial Model Summary
A board-planning starter for recurring-revenue bridges, operating assumptions, scenarios, profitability, cash, and decisions.

SAGEEP Conference Paper
Applied geophysics and near-surface engineering conference papers, using the sageep class. Verified to compile to a PDF with a resolved bibliography.

Saint Petersburg
A restrained grey-and-red Beamer theme with its own colour, font and outer themes, docstrip-generated from a single .dtx source.

University Report Title-Page Starter
A minimal university assignment and project report title-page specimen.

Satyajitghana Resume
A compact two-column resume starter with a warm accent, skills sidebar, engineering experience, selected work, and community sections.

sb2nov Resume
The de facto US tech single-column resume standard, one of the most forked LaTeX resumes on GitHub.

schooldocs
A page-layout package for school documents with several named title/header/footer styles including a dedicated exam style, plus a correction-mode toggle for an instructor answer key. Verified to compile to a PDF.

Science Textbook Template
A minimal science textbook layout with title page, contents, worked examples, exercises, and an index.

Scientific Book Starter
A plain book-class starter for a short non-fiction/science book, with a concept-map intro, worked-example chapters, and a back-matter answers section.

Scientific Poster (klb2)
Clean A0 scientific poster with configurable navy-and-orange theme, pipeline diagram, results table, limitations, and a concise take-home message.

Scientific Style Book Template
A scientific monograph starter with a featured contents page, theorem blocks, cross-references, results tables, and appendices.

Scientific Template Collection Essay
A scientific essay starter representing Cinofix's LaTeX template collection, with abstract, method, equation, results table, and discussion.

Thesis Cover Sheet and Declaration
A thesis cover sheet and signed statutory declaration from the scientific-thesis-cover package, grafted onto a plain report class so both pages drop into a thesis you have already written.

ScientificPaper Article
A neutral scientific-paper starter with background, methods, findings, and interpretation sections.

SciPost
SciPost journal submissions (Physics and its sibling journals), using the official SciPost class. Verified to compile to a PDF with a resolved bibliography.

SciPoster
An A0 portrait scientific poster with a real 3-column layout: abstract, related work, method, discussion, a system-architecture diagram, evaluation figures, a results table, an ablations table, conclusions and references.

SCOOP Letter Engine
A variable-oriented operational letter starter with recipient, context, next-step, and reference fields.

Scrabble Board
A board-game layout using the CTAN Scrabble package to draw an English board, place horizontal and vertical words, and typeset an inline word.

KOMA-Script Book
The KOMA-Script book class, with page geometry derived from classical type-area ratios instead of fixed margins.

Screenplay (CTAN)
A classic screenplay-format starter using the CTAN screenplay class for title page, slug lines, dialogue, and action.

Screenplay LaTeX
A screenplay starter with title page, slug lines, dialogue, parentheticals, action, and scene transitions.

ScribUTT Project Report
A compact French-language project report starter with objectives, indicators, implementation steps, results, limitations, and decisions.

scrletter Formal Letter
A KOMA-Script scrletter starter for professional correspondence with configurable sender variables, subject, recipient, copy line, and signature.

KOMA-Script Report
A structured technical-report starter using the KOMA-Script scrreprt class, with front matter, findings, tables, and recommendations.

SCU Beamer
A full-featured Beamer theme with its own colour, font, inner and outer themes, built for Sichuan University but usable in English with LanguageMode=en.

SE-Resume
An icon-header ATS single-column resume with section-file structure and colour tag chips for tech stacks.

Sedimentologika Preprint Article
A Sedimentologika preprint starter with plain-language summary, CRediT roles, declarations, station table, and bibliography.

seL4 Technical White Paper
A technical white-paper starter with an executive summary, design principles, work packages, measures, risks, and a decision request.

Semester Timetable
A real weekly class schedule (five courses Mon-Fri, colour-coded by type, correct rooms and times) plus an exams list and a deadlines list with priority flags. Compiles via the semesterplanner class.

seminar
One of the two historic non-Beamer presentation classes: a large-format slide/note document model that predates Beamer entirely.

Serbian Book
A Serbian Latin memoir-book starter with localized chapter names, front matter, contents, tables, and an imprint.

Serial Letters
A portable serial-letter starter showing shared KOMA-Script settings, recipient arguments, and multiple generated letters in one run.

SEU Machine Learning Assignment
The official class for Southeast University machine learning coursework, with a clean styled title block and worked-solution proof environments. Verified to compile to a PDF; ships in English mode after the class's own Chinese-language option was found broken (see README).

SF 298 Report Documentation Page
A filled-in Standard Form 298 report-documentation page with editable report identifiers, dates, authors, sponsoring agency, abstract, classification, and distribution fields.

SFEE Journal Article
Smart Factory and Energy Efficiency journal article starter with journal metadata, abstract, keywords, data/code availability, and results table.

Shahriar-Labs Assignment
A coursework assignment starter with point-valued questions, work areas, and a marking checklist.

Shakthi Kannan Tamil/English XeLaTeX Book
A Tamil and English XeLaTeX book starter with bilingual text, two-sided book geometry, running headers, front matter, and an Org-mode source workflow.

shellywhen Academic CV
A clean, comprehensive academic CV with compact section bars and structured research history.

Short Three-Column Newsletter
A compact three-column community newsletter with a full-width lead story, a road-schedule list, a classifieds board, and an events list.

SHU Laboratory Report
An engineering laboratory-report starter for temperature-sensor calibration, with requirements, instrument metadata, acceptance limits and corrective action.

Simple Article
A general-purpose research article with theorem environments, natbib bibliography, a table and a figure.

Simple Recipes for First-Time-Away-From-Home Cooks
A pocket-sized two-column recipe booklet for quick, inexpensive meals and first kitchens.

Simple CV
A multi-page academic CV with education, experience, teaching, skills/languages side by side, projects, awards and volunteering sections, plus a real biblatex-driven publications list.

Simple Laboratory Report
A deliberately minimal laboratory-report starter for short experiments, with a question, prediction, method, observations and interpretation.

simpleRecipes
A compact, dependency-light recipe-card layout with servings, ingredients, directions, and reusable recipe macros.

Simple Response Letter
A reviewer-response letter starter with reusable coloured comment and response boxes, a change summary and page references.

Simple Resume/CV
A minimalist, unstyled CV/résumé class with PDF outline bookmarks per section, released into the public domain.

Simple Thesis/Dissertation
A minimal, unencumbered XeLaTeX thesis/dissertation template with title page, copyright page, acknowledgments, abstract, and IEEE-style bibliography.

SimpleCV
A minimal classic CV with an italic-dated topic list and a numbered bibliography section for publications.

Simple Invoice
A commercial-use invoice starter using the simpleinvoice package, with customer and supplier details, references, due date, itemized VAT and payment account fields.

SimplePlus
A minimalist Beamer theme with its own title and section-divider pages, in the public domain.

SimpleTeXCV
A deliberately plain CV and matching cover letter with no icons or colour, built on the plain LaTeX letter class.

SINTEF Poster
Portrait A0 scientific poster with SINTEF-style dark header, green block hierarchy, nested inner blocks, two columns, and a conclusion footer.

SJTU Beamer
SJTU's official Beamer theme: a red gate-motif titlepage and section-progress footline, with bilingual Chinese/English support via ctexbeamer.

SJTU Exam Paper
An unofficial Shanghai Jiao Tong University exam layout with an auto-updating academic year/semester header and a conditional answer key. Ships as a complete real Operating Systems final exam. Font patched to compile on this site's TeX Live; verified rendering real Chinese glyphs.

SJTUTeX Laboratory Report
An English Shanghai Jiao Tong-style report starter with class metadata, chapters, equations, tables, discussion, and an appendix checklist.

SJTU Thesis
Shanghai Jiao Tong University's official thesis class, with a bilingual Chinese/English title page and English-language chapter, section and bibliography support.

SMF Mathematics Article
Article starter for Société mathématique de France journals (Astérisque, Bulletin, Mémoires), using the official smfart class.

Songbook
A pocket chord book using the songbook package with a title page, chord-over-lyric notation, verses, a chorus, and reusable song blocks.

Songs Lyric and Chord Book
A lyric-and-chord songbook starter using a separate song-data file with metadata, verses, chorus formatting, and reusable output modes.

Spanish Invoice
A Venezuelan legal invoice (factura fiscal) built on factura, with RIF (tax ID) fields and automatic IVA/BI computation per line item. Spanish-language convention, not a translated template — verified the printed IVA and TOTAL are real resolved numbers matching the item arithmetic.

Spectrum
A full-bleed title-graphic Beamer theme with a standout-frame mode and coloured section dividers.

SPhdThesis
A public-domain PhD thesis class (SPhdThesis) with front matter, declaration page, and screen/print colour modes.

SPIE Proceedings
SPIE Proceedings manuscripts, using the official spie document class. Verified to compile to a PDF with a resolved bibliography.

Springer-Style Article
A neutral Springer-style article starter with affiliations, keywords, results, and declarations.

SR-Vorl Book
A Springer research-book starter with front, main, and back matter, a contents page, chapters, and a results table.

Stanford Thesis Example
An original Stanford thesis-example starter with university title page, abstract, acknowledgements, contents, chapters, equation, table, and appendix.

Stanford Thesis
An unofficial Stanford University PhD dissertation style, formatted per the Registrar's requirements.

Stefano Cover Letter
A cover letter with a bold full-width name banner, matching the Friggeri CV; Nimbus Sans substituted for the upstream's bundled Roboto.

Stellenbosch University Thesis
The official Stellenbosch University thesis/dissertation class with its title page, declaration page and natbib-based bibliography.

STEM Assignment Template
A highly configurable STEM assignment layout with three title-page styles, a themeable colour scheme, and metadata-driven toggles for figures, numbering and bibliography style. Font patched to compile on this site's TeX Live. Verified to compile to a PDF.

Sticky Label Sheet
A full A4 sheet of imposed sticky address labels (3x8 grid) with a real return address repeated across every label. Compiles via the labels class.

University of Stuttgart PhD Thesis
A University of Stuttgart PhD thesis template with the real German-language title page and a bilingual English/German abstract.

Stylish Article
Substitute for the original Stylish Article template (Vel's SelfArx.cls), which is CC-BY-NC-SA and cannot be redistributed here. Uses lebhart, a colourful upstream article class with theorem environments; requires XeLaTeX or LuaLaTeX.

Classic Sudoku Worksheet
A classic 9-by-9 Sudoku worksheet with an easy-to-edit compact puzzle representation.

Sudoku Bundle
A Sudoku worksheet that prints a puzzle from a nine-line file and shows the solution generated by the sudokubundle solver.

suftesi
A distinctively typeset class spanning theses, books and articles, built on book with custom title and heading fonts.

Sullivan Business Report
A quarterly operations business report with a title page, executive summary, metrics table and prioritised recommendations.

SUSTech Homework
A clean homework layout with a course/name/ID header, running page numbers and CJK support for bilingual coursework.

Swiss Formal Letter
A Swiss business letter built on chletter, with a real fold-mark crop tick and a left-side window-envelope address position (Swiss convention). French correspondence content.

SXKDZ Homework Template
A bilingual Chinese/English homework layout with a boxed title block and matched problem/answer environments with per-problem equation numbering. Font patched to compile on this site's TeX Live; verified rendering real Chinese glyphs.

Systems and Control Letters
Systems and Control Letters article starter with systems metadata, model equation, results table, and reproducibility declarations.

SYSU Thesis Starter
The SYSU-thesis bilingual Sun Yat-sen University thesis starter with Chinese and English front matter, chapters, references, and university artwork.

Texas A&M Beamer
A neutral Texas A&M Beamer theme starter with an outline, decision block, comparison table, and next-step slide.

Tau Technical Report
A two-column technical/research report (Tau Class) with a dropcap lead paragraph, coloured section headers and an abstract/keywords block.

Tel Aviv University Thesis
A multilingual-ready Tel Aviv University thesis starter with abstract and declaration pages, structured chapters, findings tables, and appendices.

tcolorbox Beamer Inner Theme
A tcolorbox Beamer inner-theme starter with structured question, observation, and evidence blocks.

Technical Assignment Invoice
A simpleinvoice-style technical-assignment bill with fixed project fees, findings handover, due date, tax, references, and bank details.

Technical Report Cover Starter
An engineering technical-report cover with report number, client, author, and date fields.

USC Technical Report
A portable technical-report starter demonstrating the legacy CTAN techreport metadata helpers and a modern report layout.

Tehran Thesis
A Persian/English-ready Tehran thesis starter with front matter, research chapters, equations, evaluation tables, and supplementary proofs.

TEMat Article
A bilingual TEMat mathematics article starter with theorem-ready structure, equations, examples, a results table, and an implementation appendix.

Template Book Proposal
A CC-BY book-proposal layout with abstract, contents, lists of figures and tables, sample chapters, bibliography, and production planning sections.

Template Term Paper
A modular empirical term-paper starter with cover page, abstract, literature review, analysis, tables, and bibliography.

Term Paper
A student term-paper report on IEEEtran — abstract, sections, appendix, and a resolved bibliography.

Term Calendar (Class Schedule)
A term/semester class-schedule calendar (not a date grid): one column per lecture day, real dates advancing correctly across weekends, with a lecture topic per session for a 6-week compilers course starting January 2026.

TeX Cover Letter
A stylized cover letter with a split contact header, coral rule, and concise application body.

TeX CV Builder
A CV and matching cover letter sharing ten interchangeable themes, skill-bar charts and language circles, built with bundled OFL fonts.

Research Diary System
A structured technical diary with a searchable entry index, tags, repeatable experiment notes, and a decision register.

TeX-label Classification Sign
A classification sign with an editable tex-label footer token and large access notice.

Texto Livre: Linguagem e Tecnologia
Texto Livre-style Portuguese/English article starter with multilingual metadata, epigraph, equation, table, and reference section.

Thalie Drama Play
A drama-play starter with a dramatis personae, acts, scenes, character lines, and stage directions.

Themed Business Card
A green field-notes business card with QR contact link, imposed as ten cut-ready cards on A4.

Thin Formal Letter
A compact letter built on akletter, correctly positioned for a standard C5/DL window envelope with optional fold marks.

thisstillwill Business Card
A warm ten-up business-card layout with an editable identity block, contact details, and QR link.

Three-Column Newsletter
A three-column bulletin starter with recurring briefs, a sidebar, an events box, and a footer.

THU Beamer
Tsinghua University's purple-accented Beamer theme, with a smoothbars footline and full bilingual Chinese/English support via ctex.

THU Exam Paper
A Tsinghua University-style exam paper class with a graded question header, multiple choice, fill-in-the-blank and long-answer sections, and an optional inline answer key. Verified to compile to a PDF rendering real Chinese glyphs.

ThuThesis Starter
A Tsinghua University undergraduate, masters, doctoral, and postdoctoral thesis starter with Chinese and English metadata support.

Ticket Business Cards
A duplex sheet of ten visiting cards using ticket's zw32010 definition, custom front/back content and crop crosses.

TidyCV
A simple, tidy academic CV class with structured macros for research experience, publications and teaching. Not in TeX Live: this starter bundles tidycv.cls and tidycv.bst. Verified to compile to a two-page PDF with a resolved bibliography.

TidyRes Resume
A compact multi-column formal resume, using the tidyres package on an article class. Verified to compile to a one-page PDF under XeLaTeX.

TIET Question Paper
An exam-paper layout with a roll-number line, course/time/marks header, and ruled question dividers. Patched to fix a real upstream bug that hard-errored whenever no institution logo was set. Verified to compile to a PDF.

TikZ Cooking Symbols Recipe
A vector recipe-card starter using scalable oven, grill, air-fryer, and pizza symbols.

TikZ Wall Calendar
A full-year 2026 wall calendar drawn in TikZ, one wide 6-month-per-page grid with week numbers, shaded weekends, a real multi-day period (summer break) and several dated events, loaded from a separate events file.

tikzposter
A0 conference poster built with TikZ, using the block/column layout tikzposter is designed around.

Timeline Planner
An editable project-milestone timeline using the legacy CTAN timeline package, with dated events and an optional center rule.

TNM079 Modeling and Animation Lab Report
A modeling and animation laboratory report starter with model assumptions, implementation details, parameter sweeps, results, and limitations.

Tongji Thesis Starter
A neutral bilingual Tongji University thesis starter with Chinese and English front matter, chapters, tables, and appendices.

Trigon
A modern, elegant, versatile Beamer theme with a light and a dark colour variant.

TRIUMF Scientific Poster
A three-column triumf scientific poster starter for clear research communication.

TryBibby Business Card Grid
A bright editorial ten-up business-card grid with an editable masthead, contact line, and QR destination.

Tsinghua Letterhead
A logo-free bilingual Tsinghua University letterhead with Chinese correspondence, a department header, and a signature block.

TU Delft Poster
An A0 portrait research poster in TU Delft's corporate colours, with the official TU Delft logo, on tikzposter.

tucv
An academic CV style package with dedicated entry macros for schools, jobs, conferences and publications, and shaded section-heading bars.

TU Delft Light Assignment
TU Delft's own lightweight XeLaTeX report/assignment class, with its bundled Microsoft and TU-Delft-restricted fonts replaced by free metric-compatible equivalents.

TU Delft DCSC Poster
Portrait A0 research poster with TU Delft DCSC-inspired section banners, two-column flow, method diagram, results table, and project footer.

TU Dresden Thesis (tudscr)
TU Dresden's official KOMA-Script-based corporate design bundle, used here for a thesis with the university's logo and titling.

TU/e Title-Page Starter
A neutral TU/e-inspired engineering report or thesis title-page starter.

Tufte Essay
An argued essay in the Tufte handout style, with wide margins for sidenotes and a margin figure alongside the main text.

Tufte-Style Book
A book class with wide margins for sidenotes and margin figures, in the style popularised by Edward Tufte.

TUGboat
TUGboat journal articles, using the official ltugboat document class (TeX Users Group). Verified to compile to a PDF with a resolved bibliography.

Twenty Seconds Resume/CV
Sidebar CV with skill bars and a compact two-column layout, designed for a 20-second read. Not in TeX Live: this starter bundles twentysecondcv.cls. Verified to compile to a one-page PDF.

Example of Typesetting a Recipe
An article-based recipe layout with a title page, custom headers, two-column ingredients and preparation spreads, and a TikZ illustration.

University of Alberta Thesis
A University of Alberta GPS-oriented thesis starter with modular prefatory matter, chapters, references, and appendices.

University of Antwerp Course-Text Essay
A University of Antwerp course-text essay starter with the uantwerpendocs title page, course metadata, chapters, equation, table, and appendix.

UATL Thesis
A plain-report thesis skeleton with a directory-per-section layout: title page, dedication, acknowledgements, abstract, chapters, and an appendix.

UBC Dissertation
A UBC-compliant dissertation template with the required title, committee, abstract and lay-summary pages.

UCAS Homework
A CJK-ready homework style for University of Chinese Academy of Sciences coursework, with auto-numbered problems and a continuation-aware running header. Verified to compile to a PDF rendering real Chinese glyphs; a Windows-only font call was patched to a portable substitute.

UC Berkeley Thesis
The University of California, Berkeley PhD dissertation/thesis class, with approval page, copyright page, dedication, and committee front matter.

UCL
A full-width colour-banner Beamer theme for UCL, with an accent stripe and section-navigation minframes bar, official logo.

UCL Thesis Starter
An original UCL-informed dissertation starter with a clean title page, abstract, table of contents, chapter structure, and bibliography scaffold.

UCR Thesis Title Page Starter
A neutral graduate-thesis starter with a two-colour title page, abstract, chapter scaffold, and editable institutional fields.

UESTC Laboratory Report
An original self-contained XeLaTeX laboratory-report starter with experiment metadata, apparatus, procedure, observations, uncertainty, and conclusion sections.

UHH Assignment Essay
A University of Hamburg-style assignment essay with course metadata, numbered tasks and subtasks, and an original evidence-methods example.

UiS Thesis Title Page Starter
A neutral UiS-inspired thesis front-matter starter with title page, declaration, abstract, contents, and chapter scaffold.

UiT Color-Themed Poster
A portrait A0 research poster with an arctic palette, modular blocks, compact signal figure, evaluation table, and configurable affiliation line.

uiucthesis
A PhD dissertation formatted to the UIUC Graduate College's deposit requirements — title page, committee front matter, abstract/dedication, and a resolved bibliography via classic bibtex. Compiles under plain pdflatex.

ULThèse (Université Laval Thesis)
Universite Laval master's/doctoral thesis class (bilingual French/English), with frontispice, French Resume, English Abstract, and remerciements.

UnBTeX (University of Brasília Thesis)
University of Brasília (UnB) thesis/dissertation class, an ABNT-compliant abnTeX2 extension, with English-mode front matter and the required Portuguese abstract.

UNGS Spanish Laboratory Report
A Spanish laboratory report with objective, materials, procedure, tabulated results, uncertainty analysis, and conclusion.

Universal Title Page
A configurable title-page starter using uni-titlepage's Spacer style, with editable title elements, a coloured rule, publisher metadata, and title-page back matter.

University of Graz Publication
A German-language University of Graz publishing starter with title matter, contents, chapters, tables, and an imprint.

University of Trento BIM Report
A University of Trento bimonthly doctoral-report starter with research activities, school attendance, and publication entries.

University/School Laboratory Report
A formal chemistry lab report with objective/method/data/calculations/discussion sections, SI-unit tables, chemical equations and a resolved bibliography.

University of Vienna Linguistics Essay
A University of Vienna linguistics paper starter with an academic title page, declaration, structured sections, table, and bibliography.

UNSW Dissertation Title Page
A University of New South Wales dissertation title page plus the Originality, Copyright and Authenticity statements, using the unswcover package. The trademarked UNSW crest is not included; a neutral placeholder is drawn in its place. Verified to compile to a PDF.

University of Birmingham Essay
An institution-oriented essay starter with headers, footers, course metadata, a contents line, and references.

University of Illinois Thesis Starter
The University of Illinois accessible thesis and dissertation starter with tagged PDF support, front matter, chapters, references, and appendices.

UoL Physics Lab Report
A physics lab report starter for four-terminal resistivity measurements, with theory, apparatus, current-voltage data, uncertainty and conclusion sections.

US CSV Invoice
A US export commercial invoice generated from a real line-item CSV (lumber and hardware order), with waybill, weight, packing/shipping/insurance costs and a resolved grand total. Compiles via the invoice-class class.

USP/IME Thesis Starter
A Portuguese and English USP/IME masters and doctoral thesis starter with bilingual abstracts, tutorial material, and bibliography support.

USTC Thesis
University of Science and Technology of China (USTC) thesis class, with originality/AI-usage declarations, English-mode front matter, and bibtex-backed bibliography.

UT Thesis
A graduate thesis class implementing the University of Toronto School of Graduate Studies formatting requirements.

UTBM CIAD Technical Report
A neutral scientific and technical report starter with a metadata cover, change history, structured findings, definitions, and recommendations register.

UWMSlide
A simple, PowerPoint-like landscape slide class from UW-Madison, with plain/item/double-column slide environments and a small logo slot.

Venture Capital Investment Memo
An investment-committee memo with a product thesis, market view, traction, use of proceeds, outcomes, and diligence agenda.

verifica
An Italian high-school test layout with a boxed header, multiple multiple-choice styles, a true/false grid, and a fill-in-the-blank cloze helper. Verified to compile to a PDF.

Verona Beamer Starter
An original warm, calm Beamer starter for structured academic presentations, with question, method, and decision sections.

Vertical Line Title Page
A report title page using titlepic's picture slot for a drawn vertical rule with tick marks instead of a photograph, continuing into an abstract and introduction.

Vienna CS Thesis
A University of Vienna CS-Faculty-style thesis — title page, English abstract, German Kurzfassung, acronym list, and chapters covering tables, listings, and algorithms.

viiptart Mathematical Article
A mathematical article starter with theorem, proof, notation, examples, and conclusions.

Virginia Tech Research Poster
A portable A0 research poster with a maroon-and-orange institutional-style palette, three-column evidence flow, results table, and limitations panel.

Volumes Book
A multi-volume book starter using numbered included files, shared front matter, and selectable volume output.

University of Warwick Poster
A three-column university of warwick poster starter for clear research communication.

Weekly Planner Booklet
An A5-landscape weekpage-per-spread planner (folds to A6 for binding) with an optional class timetable. Ships with 5 real January-February 2026 weeks including a week that crosses the month boundary.

Wenneker Resume/CV
Substitute for the original Wenneker Resume/CV template (Frits Wenneker, via Vel), which is CC-BY-NC-SA and cannot be redistributed here. This is a different resume of the same kind: the upstream moderncv class, styled fancy with an orange accent.

whatsnote Science Notes
A structured science and engineering research-notes starter using the whatsnote class, with setup, run log, observations, decisions and next-action prompts.

Wi-Fi Credential Cards
A full sheet of 10 business-card-sized Wi-Fi guest-network cards, each with a scannable WIFI: QR code plus the SSID and password in plain text. Compiles via qrcode and fontawesome, both in TeX Live.

Wile E. Invoice
A ledger-style invoice class in monospace, with an itemized order table, subtotal/discount/tax/total block and a paid-status line. Compiles to a PDF with a resolved order table.

Willow Tree Book
A simplified memoir derivative for lecture notes, with definitions, problems/answers and a bibliography.

Wireless Foundations Poster
A 40in by 30in landscape poster using explicit text blocks on a manual-placement grid, with equations, results, backup guidance, and references.

WisdomFusion Programming Book
A Chinese technical-book starter using the progbookcn class with chapters, code-oriented typography, and a sample title page.

Exercise Worksheet Class
A weekly problem-set layout with matched exercise/solution environments, auto-numbered nested questions and answers, and a class option to hide solutions for a clean student handout. Verified to compile to a PDF.

Worksheet
A course-worksheet layout with an auto-numbered title, an author/course header, and an exercise environment that annotates each question with score, difficulty, learning targets and prior occurrence. Verified to compile to a PDF.

WUSTL Dissertation
A Washington University in St. Louis memoir-based dissertation starter with front matter, chapters, tables, and appendices.

XeLaTeX Guide Book
An English-only XeLaTeX starter on fontspec and document structure, adapted from a Chinese-language CJK typesetting guide.

Xovee LaTeX CV
An academic CV that shows each section (Education, Employment) in several alternative layouts back to back, so you pick the one you like and delete the rest, plus a separate publications file.

xsim
Exercise sheets with points, bonus points and subtitles per exercise, and an answer key generated separately via \printsolutions.

xtufte
A Unicode-engine fork of the classic Tufte book class — margin sidenotes and figures, OpenType fonts, and a resolved bibtex bibliography.

Yet Another Letter
A configurable Yet Another Letter starter with named addresses, adjustable salutations and farewells, enclosure line, and last-page reference.

yathesis
A French PhD thesis class implementing the French Ministry of Higher Education's formatting rules, including a full jury/committee title page.

yb-book
A monospace-styled book class with a margin pull-quote box, real index, and bibliography, used by its author for self-published technical books.

ycbook
A space-economical book class with configurable chapter-heading rules and alignment, built on the mwbk book class.

Yet Another Invoice Template
A clean, straightforward invoice with bill-to details, alternating line items, subtotal, tax, total, and payment note.

Universidad Autónoma de Zacatecas Lab Report
Spanish laboratory report starter with abstract, introduction, theoretical basis, reproducible method, results, discussion, and conclusion.

Zappala Simple Lab Report
A compact self-contained laboratory report starter with research question, method, observations, uncertainty analysis, and conclusion.

Persian Thesis Starter
A Persian thesis starter with right-to-left front matter, Latin technical content, equations, tables, and appendices.

Zhbook Chinese Science Book
A XeLaTeX Chinese-science-book starter using the zhbook class, configuration, bibliography style, and a sample title page.

ZJU Lab Report
A bilingual Zhejiang-style laboratory-report starter with objective, method, measurements, uncertainty analysis, discussion, and conclusion sections.

Zhejiang University Thesis
A bilingual-ready Zhejiang University thesis starter with editable front matter, chapter structure, results tables, appendices, and references.

ZUGFeRD e-Invoice
A German B2B invoice with a resolved four-line VAT table (Summe Netto/Brutto), producing a ZUGFeRD/Faktur-X compliant PDF/A-3 with the structured invoice data embedded as an XML attachment. Compiles via the zugferd class under lualatex.

zzamboni/vita Academic CV
A data-first academic CV starter for appointments, publications, teaching, service, and research tools.

ZzTeX Plain-TeX Book
A Plain TeX book starter using ZzTeX chapter, section, and list blocks for technical manuscripts.
The rest of the catalogue is still being migrated — see the rebuild progress.
Browse by category instead
All 22 categories are live. These are the six most visited.
Curricula Vitae
Academic CVs and résumés — the longest-running and most visited section of the site.
Articles
General-purpose article layouts for papers, reports and short write-ups.
Presentations
Slide decks built with Beamer and other LaTeX presentation classes.
Books
Full-length book layouts, with front matter, chapters and back matter.
Conference Posters
Large-format posters for conferences and research symposia.
Theses
Masters and doctoral thesis layouts, including title pages and declarations.
While you wait
If you are new to LaTeX, the guides are already written and do not depend on the migration:
- What is LaTeX?— what it is and where it came from.
- LaTeX for beginners— what to install and the first commands to learn.
- Why use LaTeX?— the case for it, and when not to bother.
- svgnames colour reference— every colour name the xcolor package's svgnames option provides.